If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344081714020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.917305,"lon":-111.093717,"icon":""}]} |
Location: 02/14-17-034-08W4/0 | |
Location Alias: 02/14-17-34-08 W4M | |
Location Alias 2: 02/14-17-034-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 08 | |
Section: 17 | |
County/Municipality: Special Areas No. 4 | |
Well Name: TAC 8-17 HZ 102 PROVOST 14-17-34-8 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0489031 | |
License Date: 2018-05-03 | |
License Status: Issued | |
Spud Date: 2018-05-24 | |
Final Drill Date: 2018-06-29 | |
Well Total Depth: 1865.00 m | |
Surface Hole Latitude: 51.917305 | |
Surface Hole Longitude: -111.093717 |
Date | Event |
---|---|
2018-05-03 | Obtained License |
2018-05-24 | Surface Casing Operation Performed |
2018-06-28 | Direction Drilling Operation Performed - Deviate |
2018-06-28 | Direction Drilling Operation Performed - Horizontal |
2018-06-29 | Finished Drilling |
2018-06-29 | Production Casing Operation Performed |
2018-06-29 | Rig Released |
2018-06-29 | Well Log Performed |
2018-06-29 | Well Mode changed to Drilled and Cased |
2018-07-06 | Perforation Treatment Performed - Jet Perforation |
2018-07-13 | Perforation Treatment Performed - Fractured |
2018-07-14 | Perforation Treatment Performed - Fractured |
2018-07-21 | Well Began Production |
2018-07-21 | Well Fluid changed to Crude Oil |
2018-07-21 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-06-28 | Tempco Drilling Company Inc. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-06-28 | 219.60 | Deviate (5 - 79 degrees) |
2018-06-28 | 998.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-07-06 | Perforation | 1843.00 | 1843.50 | 20 |
2018-07-06 | Perforation | 1561.00 | 1561.50 | 20 |
2018-07-06 | Perforation | 1531.00 | 1531.50 | 20 |
2018-07-06 | Perforation | 1496.00 | 1496.50 | 20 |
2018-07-06 | Perforation | 1458.00 | 1458.50 | 20 |
2018-07-06 | Perforation | 1430.00 | 1430.50 | 20 |
2018-07-06 | Perforation | 1401.00 | 1401.50 | 20 |
2018-07-06 | Perforation | 1366.00 | 1366.50 | 20 |
2018-07-06 | Perforation | 1336.00 | 1336.50 | 20 |
2018-07-06 | Perforation | 1301.00 | 1301.50 | 20 |
2018-07-06 | Perforation | 1271.00 | 1271.50 | 20 |
2018-07-06 | Perforation | 1818.00 | 1818.50 | 20 |
2018-07-06 | Perforation | 1237.00 | 1237.50 | 20 |
2018-07-06 | Perforation | 1207.00 | 1207.50 | 20 |
2018-07-06 | Perforation | 1173.00 | 1173.50 | 20 |
2018-07-06 | Perforation | 1143.00 | 1143.50 | 20 |
2018-07-06 | Perforation | 1105.00 | 1105.50 | 20 |
2018-07-06 | Perforation | 1069.00 | 1069.50 | 20 |
2018-07-06 | Perforation | 1038.00 | 1038.50 | 20 |
2018-07-13 | Fracture | 1843.00 | 1843.50 | 0 |
2018-07-13 | Fracture | 1818.00 | 1818.50 | 0 |
2018-07-13 | Fracture | 1791.00 | 1791.50 | 0 |
2018-07-06 | Perforation | 1791.00 | 1791.50 | 20 |
2018-07-13 | Fracture | 1754.00 | 1754.50 | 0 |
2018-07-13 | Fracture | 1724.00 | 1724.50 | 0 |
2018-07-13 | Fracture | 1689.00 | 1689.50 | 0 |
2018-07-13 | Fracture | 1660.00 | 1660.50 | 0 |
2018-07-13 | Fracture | 1626.00 | 1626.50 | 0 |
2018-07-13 | Fracture | 1596.00 | 1596.50 | 0 |
2018-07-13 | Fracture | 1561.00 | 1561.50 | 0 |
2018-07-13 | Fracture | 1531.00 | 1531.50 | 0 |
2018-07-14 | Fracture | 1496.00 | 1496.50 | 0 |
2018-07-14 | Fracture | 1458.00 | 1458.50 | 0 |
2018-07-06 | Perforation | 1754.00 | 1754.50 | 20 |
2018-07-14 | Fracture | 1430.00 | 1430.50 | 0 |
2018-07-14 | Fracture | 1401.00 | 1401.50 | 0 |
2018-07-14 | Fracture | 1366.00 | 1366.50 | 0 |
2018-07-14 | Fracture | 1336.00 | 1336.50 | 0 |
2018-07-14 | Fracture | 1301.00 | 1301.50 | 0 |
2018-07-14 | Fracture | 1271.00 | 1271.50 | 0 |
2018-07-14 | Fracture | 1237.00 | 1237.50 | 0 |
2018-07-14 | Fracture | 1207.00 | 1207.50 | 0 |
2018-07-14 | Fracture | 1173.00 | 1173.50 | 0 |
2018-07-14 | Fracture | 1143.00 | 1143.50 | 0 |
2018-07-06 | Perforation | 1724.00 | 1724.50 | 20 |
2018-07-14 | Fracture | 1105.00 | 1105.50 | 0 |
2018-07-14 | Fracture | 1069.00 | 1069.50 | 0 |
2018-07-14 | Fracture | 1038.00 | 1038.50 | 0 |
2018-07-06 | Perforation | 1689.00 | 1689.50 | 20 |
2018-07-06 | Perforation | 1660.00 | 1660.50 | 20 |
2018-07-06 | Perforation | 1626.00 | 1626.50 | 20 |
2018-07-06 | Perforation | 1596.00 | 1596.50 | 20 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-07-13 | 2018-07-14 | 882 | 862 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 82.7895 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 17.155 | N/A | ||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.059 | N/A | |
water | 7732-18-5 | 100 | 0.059 | N/A | ||||
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0526 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1823 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.1823 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.1823 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.1823 | N/A | ||||
IH-FR-1C | Fusion Technologies Inc. | Friction Reducer | Non-Whimis Regulated | Not Available | 100 | 0.0262 | N/A | |
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.3123 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | Methanol | 67-56-1 | 100 | 0.0826 | N/A | |
Trimethylopropane ethoxylated | 52624-57-4 | 100 | 0.0826 | N/A | ||||
water | 7732-18-5 | 100 | 0.0826 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-07-07 | 2018-07-15 | Oilfield Produced Water | 788 |
2018-07-07 | 2018-07-15 | Oilfield Produced Water | 45 |
2018-07-07 | 2018-07-15 | Oilfield Produced Water | 16 |
2018-07-07 | 2018-07-15 | Central Water Distribution Facility | 48 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 3795 | 0.0 | 0.0 | 0.0 |
2019 | 8611 | 0.0 | 0.0 | 0.0 |
2020 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-06-29 | No Incident Encountered | 0.00 | 0.00 |
2018-07-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]