If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344081614F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.938408,"lon":-111.08325,"icon":""}]} |
Location: F1/14-16-034-08W4/0 | |
Location Alias: F1/14-16-34-08 W4M | |
Location Alias 2: F1/14-16-034-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 08 | |
Section: 16 | |
County/Municipality: Special Areas No. 4 | |
Well Name: TAC WW HZ 1F1 PROVOST 14-16-34-8 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0494271 | |
License Date: 2019-04-23 | |
License Status: Issued | |
Spud Date: 2019-05-17 | |
Final Drill Date: 2019-06-09 | |
Well Total Depth: 2005.00 m | |
Surface Hole Latitude: 51.938408 | |
Surface Hole Longitude: -111.083250 |
Date | Event |
---|---|
2019-04-23 | Obtained License |
2019-05-17 | Set Surface |
2019-05-17 | Surface Casing Operation Performed |
2019-06-07 | Direction Drilling Operation Performed - Deviate |
2019-06-07 | Direction Drilling Operation Performed - Horizontal |
2019-06-07 | Drill To LD |
2019-06-07 | Intermediate Casing Operation Performed |
2019-06-09 | Finished Drilling |
2019-06-09 | Well Log Performed |
2019-06-09 | Well Mode changed to Drilled and Cased |
2019-06-10 | Liner Casing Operation Performed |
2019-06-10 | Perforation Treatment Performed - Slotted Liner or Casing |
2019-06-11 | Rig Released |
2019-06-28 | Well Began Production |
2019-06-28 | Well Fluid changed to Water |
2019-06-28 | Well Type changed to Source |
2020-02-01 | Well Fluid changed to Crude Oil |
2020-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-06-07 | Tempco Drilling Company Inc. | 5 | Drill To LD | |
2019-05-17 | Predator Drilling Inc. | 27 | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-06-07 | 171.60 | Deviate (5 - 79 degrees) |
2019-06-07 | 457.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-06-10 | Slotted Liner | 536.00 | 1365.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 4560 | 0.0 | 0.0 | 0.0 |
2020 | 1992 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]