X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344081510000

Well Details

Well ID: 0344081510000
Loading map...
Location: 00/10-15-034-08W4/0
Location Alias: 00/10-15-34-08 W4M
Location Alias 2: 00/10-15-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 15
County/Municipality: Special Areas No. 4
Well Name: PETROREP ET AL PROVOST 10-15-34-8
Operator Name: Bonavista Energy Corporation
License Number: 0051571
License Date: 1974-10-22
License Status: RecCertified
Spud Date: 1974-11-21
Final Drill Date: 1974-11-24
Well Total Depth: 907.70 m
Surface Hole Latitude: 51.920125
Surface Hole Longitude: -111.053364

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-22 Obtained License
1974-11-24 Finished Drilling
1974-11-25 Production Casing Operation Performed
1974-11-25 Well Mode changed to Drilled and Cased
1975-09-29 Perforation Treatment Performed - Jet Perforation
1975-09-30 Perforation Treatment Performed - Fractured
1976-12-15 Well Began Production
1976-12-15 Well Fluid changed to Crude Oil
1976-12-15 Well Mode changed to Pumping
1979-06-15 Perforation Treatment Performed - Jet Perforation
1979-06-28 Perforation Treatment Performed - Fractured
1987-12-01 Well Fluid changed to Crude Oil
1987-12-01 Well Mode changed to Suspended
1997-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-13 Plug Back Performed
1997-07-13 Well Fluid changed to Crude Oil
1997-07-13 Well Mode changed to Abandoned Zone
1997-09-29 Well Abandoned
1997-09-29 Well Fluid changed to Crude Oil
1997-09-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-29 Perforation 878.10 880.00 13
1975-09-30 Fracture 878.10 880.00 0
1979-06-15 Perforation 872.60 874.20 13
1979-06-15 Perforation 874.80 876.30 13
1979-06-15 Perforation 878.10 880.60 13
1979-06-28 Fracture 872.60 880.60 0
1997-07-13 Packing Device Capped w/Cement 853.00 861.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 234 0.0 0.0 0.0
1976 8533 0.0 0.0 0.0
1977 8602 0.0 0.0 0.0
1978 8490 0.0 0.0 0.0
1979 7506 0.0 0.0 0.0
1980 8531 0.0 0.0 0.0
1981 8305 0.0 0.0 0.0
1982 8347 0.0 0.0 0.0
1983 8629 0.0 0.0 0.0
1984 8281 0.0 0.0 0.0
1985 6537 0.0 0.0 0.0

For data sources see[5]

References