X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344081104000

Well Details

Well ID: 0344081104000
Loading map...
Location: 00/04-11-034-08W4/0
Location Alias: 00/04-11-34-08 W4M
Location Alias 2: 00/04-11-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 11
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 4-11-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0050126
License Date: 1974-06-14
License Status: Abandoned
Spud Date: 1974-09-13
Final Drill Date: 1974-09-15
Well Total Depth: 899.20 m
Surface Hole Latitude: 51.898194
Surface Hole Longitude: -111.041363

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-14 Obtained License
1974-09-14 Surface Casing Operation Performed
1974-09-15 Finished Drilling
1974-09-15 Well Mode changed to Drilled and Cased
1974-09-16 Production Casing Operation Performed
1975-07-08 Perforation Treatment Performed - Fractured
1975-07-08 Perforation Treatment Performed - Jet Perforation
1975-08-04 Well Began Production
1975-08-04 Well Fluid changed to Crude Oil
1975-08-04 Well Mode changed to Pumping
2002-08-30 Well Fluid changed to Crude Oil
2002-08-30 Well Mode changed to Suspended
2004-01-16 Well Log Performed
2004-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-17 Perforation Treatment Performed - Jet Perforation
2004-01-17 Plug Back Performed
2004-01-17 Well Fluid changed to Crude Oil
2004-01-17 Well Mode changed to Abandoned Zone
2004-01-20 Perforation Treatment Performed - Fractured
2004-09-24 Well Log Performed
2004-09-25 Perforation Treatment Performed - Jet Perforation
2018-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-22 Plug Back Performed
2018-11-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-08 Perforation 869.00 871.40 13
1975-07-08 Fracture 869.00 871.40 0
2004-01-17 Packing Device Capped w/Cement 850.00 858.00 0
2004-01-17 Perforation 799.80 802.90 20
2004-01-20 Fracture 799.80 802.90 0
2004-09-25 Perforation 151.20 153.60 20
2018-10-22 Packing Device Capped w/Cement 785.20 793.20 0
2018-10-22 Packing Device Capped w/Cement 137.00 145.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 3265 0.0 0.0 0.0
1976 6145 0.0 0.0 0.0
1977 8352 0.0 0.0 0.0
1978 8383 0.0 0.0 0.0
1979 3229 0.0 0.0 0.0
1980 7625 0.0 0.0 0.0
1981 7177 0.0 0.0 0.0
1982 7760 0.0 0.0 0.0
1983 8443 0.0 0.0 0.0
1984 8222 0.0 0.0 0.0
1985 7109 0.0 0.0 0.0
1986 8465 0.0 0.0 0.0
1987 8256 0.0 0.0 0.0
1988 8608 0.0 0.0 0.0
1989 7807 0.0 0.0 0.0
1990 8423 0.0 0.0 0.0
1991 7686 0.0 0.0 0.0
1992 8452 0.0 0.0 0.0
1993 8470 0.0 0.0 0.0
1994 7756 0.0 0.0 0.0
1995 8501 0.0 0.0 0.0
1996 7192 0.0 0.0 0.0
1997 7854 0.0 0.0 0.0
1998 8567 0.0 0.0 0.0
1999 8635 0.0 0.0 0.0
2000 8509 0.0 0.0 0.0
2001 8178 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References