X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344073013020

Well Details

Well ID: 0344073013020
Loading map...
Location: 02/13-30-034-07W4/0
Location Alias: 02/13-30-34-07 W4M
Location Alias 2: 02/13-30-034-07 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 07
Section: 30
County/Municipality: Special Areas No. 4
Well Name: TAC 7-25 HZ 102 PROVOST 13-30-34-7
Operator Name: Tamarack Acquisition Corp.
License Number: 0496967
License Date: 2019-12-17
License Status: Issued
Spud Date: 2020-01-31
Final Drill Date: 2020-02-19
Well Total Depth: 2311.00 m
Surface Hole Latitude: 51.943918
Surface Hole Longitude: -111.008342

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-18 Tempco Drilling Company Inc. 5 Drill To LD
2020-01-31 Hertz & Paluck Energy Services Inc. 1 Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-18 197.40 Deviate (5 - 79 degrees)
2020-02-19 1020.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-28 Perforation 2288.00 2288.50 20
2020-02-28 Perforation 1745.00 1745.50 20
2020-02-28 Perforation 1700.00 1700.50 20
2020-02-28 Perforation 1647.00 1647.50 20
2020-02-28 Perforation 1593.00 1593.50 20
2020-02-28 Perforation 1538.00 1538.50 20
2020-02-28 Perforation 1483.00 1483.50 20
2020-02-28 Perforation 1429.00 1429.50 20
2020-02-28 Perforation 1374.00 1374.50 20
2020-02-28 Perforation 1320.00 1320.50 20
2020-02-28 Perforation 1265.00 1265.50 20
2020-02-28 Perforation 2234.00 2234.50 20
2020-02-28 Perforation 1211.00 1211.50 20
2020-02-28 Perforation 1157.00 1157.50 20
2020-02-28 Perforation 1103.00 1103.50 20
2020-02-28 Perforation 1048.00 1048.50 20
2020-03-02 Fracture 2288.00 2288.50 0
2020-03-02 Fracture 2234.00 2234.50 0
2020-03-02 Fracture 2181.00 2181.50 0
2020-03-02 Fracture 2137.00 2137.50 0
2020-03-02 Fracture 2087.00 2087.50 0
2020-03-02 Fracture 2045.00 2045.50 0
2020-02-28 Perforation 2181.00 2181.50 20
2020-03-02 Fracture 1905.00 1905.50 0
2020-03-02 Fracture 1855.00 1855.50 0
2020-03-02 Fracture 1800.00 1800.50 0
2020-03-02 Fracture 1745.00 1745.50 0
2020-03-02 Fracture 1700.00 1700.50 0
2020-03-02 Fracture 1647.00 1647.50 0
2020-03-02 Fracture 1593.00 1593.50 0
2020-03-02 Fracture 1538.00 1538.50 0
2020-03-02 Fracture 1483.00 1483.50 0
2020-03-02 Fracture 1429.00 1429.50 0
2020-02-28 Perforation 2137.00 2137.50 20
2020-03-02 Fracture 1374.00 1374.50 0
2020-03-02 Fracture 1320.00 1320.50 0
2020-03-02 Fracture 1265.00 1265.50 0
2020-03-02 Fracture 1211.00 1211.50 0
2020-03-02 Fracture 1157.00 1157.50 0
2020-03-02 Fracture 1103.00 1103.50 0
2020-03-02 Fracture 1048.00 1048.50 0
2020-02-28 Perforation 2087.00 2087.50 20
2020-02-28 Perforation 2045.00 2045.50 20
2020-02-28 Perforation 1905.00 1905.50 20
2020-02-28 Perforation 1855.00 1855.50 20
2020-02-28 Perforation 1800.00 1800.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 496 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-20 No Incident Encountered 0.00 0.00
2020-03-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References