X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344070203002

Well Details

Well ID: 0344070203002
Loading map...
Location: 00/03-02-034-07W4/2
Location Alias: 00/03-02-34-07 W4M
Location Alias 2: 00/03-02-034-07 W4/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 07
Section: 02
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 3-2-34-7
Operator Name: Tamarack Acquisition Corp.
License Number: 0251196
License Date: 2001-02-14
License Status: Suspension
Spud Date: 2001-04-07
Final Drill Date: 2001-04-10
Well Total Depth: 1012.00 m
Surface Hole Latitude: 51.885438
Surface Hole Longitude: -110.890935

For data sources see[1][2]

Well History

Date Event
2001-02-14 Obtained License
2001-04-08 Surface Casing Operation Performed
2001-04-10 Drill Stem Test Performed
2001-04-10 Finished Drilling
2001-04-10 Well Log Performed
2001-04-10 Well Mode changed to Drilled and Cased
2001-04-11 Drill Stem Test Performed
2001-04-12 Production Casing Operation Performed
2001-04-12 Rig Released
2001-04-21 Perforation Treatment Performed - Jet Perforation
2001-04-21 Well Log Performed
2001-04-22 Perforation Treatment Performed - Jet Perforation
2001-04-22 Well Log Performed
2001-06-03 Well Began Production
2001-06-03 Well Fluid changed to Gas
2001-06-03 Well Mode changed to Flowing
2001-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-12 Plug Back Performed
2001-09-12 Well Log Performed
2001-09-13 Perforation Treatment Performed - Jet Perforation
2001-09-13 Perforation Treatment Performed - Remedial Casing
2001-09-13 Well Log Performed
2014-10-23 Well Fluid changed to Gas
2014-10-23 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-04-21 Perforation 980.00 982.00 20
2001-04-22 Perforation 837.50 839.00 20
2001-09-12 Packing Device Capped w/Cement 965.70 973.70 0
2001-09-13 Perforation 321.00 322.00 13
2001-09-13 Remedial Casing Cementing 321.00 322.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4875 0.0 0.0 0.0
2002 7475 0.0 0.0 0.0
2003 8669 0.0 0.0 0.0
2004 8749 0.0 0.0 0.0
2005 8703 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 8700 0.0 0.0 0.0
2008 8728 0.0 0.0 0.0
2009 8730 0.0 0.0 0.0
2010 8723 0.0 0.0 0.0
2011 6547 0.0 0.0 0.0
2012 3842 0.0 0.0 0.0

For data sources see[5]

References