X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344042910000

Well Details

Well ID: 0344042910000
Loading map...
Location: 00/10-29-034-04W4/0
Location Alias: 00/10-29-34-04 W4M
Location Alias 2: 00/10-29-034-04 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 04
Section: 29
County/Municipality: Special Areas No. 4
Well Name: ACL PROVO 10-29-34-4
Operator Name: Karve Energy Inc.
License Number: 0229311
License Date: 1999-11-26
License Status: Issued
Spud Date: 1999-12-10
Final Drill Date: 1999-12-13
Well Total Depth: 881.00 m
Surface Hole Latitude: 51.950188
Surface Hole Longitude: -110.535872

For data sources see[1][2]

Well History

Date Event
1999-11-26 Obtained License
1999-12-11 Surface Casing Operation Performed
1999-12-13 Finished Drilling
1999-12-14 Drill Stem Test Performed
1999-12-14 Well Log Performed
1999-12-15 Production Casing Operation Performed
1999-12-15 Rig Released
1999-12-15 Well Mode changed to Drilled and Cased
2000-01-04 Well Log Performed
2000-01-05 Perforation Treatment Performed - Jet Perforation
2000-01-05 Well Log Performed
2000-08-24 Well Began Production
2000-08-24 Well Fluid changed to Gas
2000-08-24 Well Mode changed to Flowing
2000-08-26 Well Fluid changed to Gas
2000-08-26 Well Mode changed to Flowing
2002-09-01 Well Fluid changed to Gas
2002-09-01 Well Mode changed to Suspended
2005-12-14 Well Log Performed
2005-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-15 Plug Back Performed
2005-12-15 Well Fluid changed to Gas
2005-12-15 Well Log Performed
2005-12-15 Well Mode changed to Abandoned Zone
2005-12-16 Perforation Treatment Performed - Fractured
2005-12-16 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-05 Perforation 751.30 751.80 20
2005-12-15 Packing Device Capped w/Cement 738.00 746.00 0
2005-12-16 Perforation 693.00 694.00 17
2005-12-16 Perforation 696.50 697.50 17
2005-12-16 Fracture 693.00 697.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2580 0.0 0.0 0.0
2001 4718 0.0 0.0 0.0

For data sources see[5]

References