X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344041510004

Well Details

Well ID: 0344041510004
Loading map...
Location: 00/10-15-034-04W4/4
Location Alias: 00/10-15-34-04 W4M
Location Alias 2: 00/10-15-034-04 W4/04
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 04
Section: 15
County/Municipality: Special Areas No. 4
Well Name: ACL PROVOST 10-15-34-4
Operator Name: Karve Energy Inc.
License Number: 0247349
License Date: 2000-12-16
License Status: Suspension
Spud Date: 2001-01-06
Final Drill Date: 2001-01-09
Well Total Depth: 926.00 m
Surface Hole Latitude: 51.922654
Surface Hole Longitude: -110.487361

For data sources see[1][2]

Well History

Date Event
2000-12-16 Obtained License
2001-01-07 Direction Drilling Operation Performed - Deviate
2001-01-07 Surface Casing Operation Performed
2001-01-09 Finished Drilling
2001-01-09 Well Mode changed to Drilled and Cased
2001-01-10 Production Casing Operation Performed
2001-01-10 Rig Released
2001-01-10 Well Log Performed
2001-01-19 Perforation Treatment Performed - Jet Perforation
2001-01-19 Well Log Performed
2001-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-20 Perforation Treatment Performed - Jet Perforation
2001-01-20 Plug Back Performed
2001-01-20 Well Log Performed
2001-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-21 Plug Back Performed
2001-01-21 Well Log Performed
2001-01-23 Perforation Treatment Performed - Jet Perforation
2001-01-23 Well Log Performed
2001-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-24 Plug Back Performed
2001-01-24 Well Log Performed
2001-02-02 Perforation Treatment Performed - Jet Perforation
2001-02-02 Well Log Performed
2001-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-03 Perforation Treatment Performed - Remedial Casing
2001-02-08 Perforation Treatment Performed - Jet Perforation
2001-02-08 Well Log Performed
2001-02-09 Perforation Treatment Performed - Remedial Casing
2001-02-17 Perforation Treatment Performed - Jet Perforation
2001-02-17 Well Log Performed
2001-02-18 Perforation Treatment Performed - Remedial Casing
2001-02-26 Perforation Treatment Performed - Jet Perforation
2001-02-26 Well Log Performed
2001-02-27 Perforation Treatment Performed - Remedial Casing
2001-03-09 Perforation Treatment Performed - Cement Squeeze
2001-03-12 Perforation Treatment Performed - Jet Perforation
2001-03-12 Well Log Performed
2001-03-12 Well Mode changed to Drilled and Cased
2001-04-25 Perforation Treatment Performed - Fractured
2002-01-22 Well Began Production
2002-01-22 Well Fluid changed to Gas
2002-01-22 Well Mode changed to Flowing
2002-02-01 Well Fluid changed to Gas
2002-02-01 Well Mode changed to Pumping
2008-04-01 Well Fluid changed to Gas
2008-04-01 Well Mode changed to Suspended
2018-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-12 Plug Back Performed
2018-12-12 Well Fluid changed to Gas
2018-12-12 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-01-07 172.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-19 Perforation 893.50 895.00 17
2001-02-08 Perforation 449.50 450.50 14
2001-02-09 Remedial Casing Cementing 449.50 450.50 0
2001-02-17 Perforation 269.00 269.30 14
2001-02-18 Remedial Casing Cementing 269.00 269.30 0
2001-02-26 Perforation 184.00 184.30 14
2001-02-27 Remedial Casing Cementing 184.00 184.30 0
2001-03-09 Cement Squeeze 184.00 184.30 0
2001-03-12 Perforation 840.50 842.50 17
2001-04-25 Fracture 840.50 842.50 0
2018-12-12 Packing Device Capped w/Cement 827.00 835.00 0
2001-01-20 Packing Device Capped w/Cement 882.00 892.00 0
2001-01-20 Perforation 876.00 880.00 17
2001-01-21 Packing Device Capped w/Cement 865.00 875.00 0
2001-01-23 Perforation 867.00 870.00 17
2001-01-24 Packing Device Capped w/Cement 854.00 864.00 0
2001-02-02 Perforation 604.00 605.00 14
2001-02-03 Acid Treatment 604.00 605.00 0
2001-02-03 Remedial Casing Cementing 604.00 605.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 8050 0.0 0.0 0.0
2003 7643 0.0 0.0 0.0
2004 6585 0.0 0.0 0.0
2005 8670 0.0 0.0 0.0
2006 7001 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References