X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344033303000

Well Details

Well ID: 0344033303000
Loading map...
Location: 00/03-33-034-03W4/0
Location Alias: 00/03-33-34-03 W4M
Location Alias 2: 00/03-33-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 33
County/Municipality: Special Areas No. 4
Well Name: RHE PROVOST 3-33-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0483964
License Date: 2017-06-12
License Status: Issued
Spud Date: 2017-06-29
Final Drill Date: 2017-08-10
Well Total Depth: 2385.00 m
Surface Hole Latitude: 51.969998
Surface Hole Longitude: -110.376450

For data sources see[1][2]

Well History

Date Event
2017-06-12 Obtained License
2017-06-29 Surface Casing Operation Performed
2017-08-09 Direction Drilling Operation Performed - Deviate
2017-08-09 Direction Drilling Operation Performed - Horizontal
2017-08-10 Finished Drilling
2017-08-10 Well Log Performed
2017-08-10 Well Mode changed to Drilled and Cased
2017-08-11 Production Casing Operation Performed
2017-08-11 Rig Released
2017-08-17 Well Log Performed
2017-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-06 Well Began Production
2017-09-06 Well Fluid changed to Crude Oil
2017-09-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-08 Precision Drilling Corporation 292 N/A Drill To LD
2017-06-28 Predator Drilling Inc. 27 N/A Set Surface
2017-06-29 Predator Drilling Inc. 27 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-09 450.20 Deviate (5 - 79 degrees)
2017-08-09 984.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-30 Multi-Stage Fracture 2318.50 2318.60 0
2017-08-30 Multi-Stage Fracture 2052.50 2052.60 0
2017-08-30 Multi-Stage Fracture 2016.80 2016.90 0
2017-08-30 Multi-Stage Fracture 1981.20 1981.30 0
2017-08-30 Multi-Stage Fracture 1945.80 1945.90 0
2017-08-30 Multi-Stage Fracture 1910.50 1910.60 0
2017-08-30 Multi-Stage Fracture 1875.00 1875.10 0
2017-08-30 Multi-Stage Fracture 1850.70 1850.80 0
2017-08-30 Multi-Stage Fracture 1803.80 1803.90 0
2017-08-30 Multi-Stage Fracture 1779.70 1779.80 0
2017-08-30 Multi-Stage Fracture 1744.30 1744.40 0
2017-08-30 Multi-Stage Fracture 2291.20 2291.30 0
2017-08-30 Multi-Stage Fracture 1708.90 1709.00 0
2017-08-30 Multi-Stage Fracture 1672.90 1673.00 0
2017-08-30 Multi-Stage Fracture 1637.30 1637.40 0
2017-08-30 Multi-Stage Fracture 1602.00 1602.10 0
2017-08-30 Multi-Stage Fracture 1521.00 1521.10 0
2017-08-30 Multi-Stage Fracture 1451.00 1451.10 0
2017-08-30 Multi-Stage Fracture 1427.10 1427.20 0
2017-08-30 Multi-Stage Fracture 1391.80 1391.90 0
2017-08-31 Multi-Stage Fracture 1356.40 1356.50 0
2017-08-31 Multi-Stage Fracture 1332.60 1332.70 0
2017-08-30 Multi-Stage Fracture 2267.10 2267.20 0
2017-08-31 Multi-Stage Fracture 1297.50 1297.60 0
2017-08-31 Multi-Stage Fracture 1262.30 1262.40 0
2017-08-31 Multi-Stage Fracture 1238.30 1238.40 0
2017-08-31 Multi-Stage Fracture 1192.00 1192.10 0
2017-08-31 Multi-Stage Fracture 1135.10 1135.20 0
2017-08-31 Multi-Stage Fracture 1099.90 1100.00 0
2017-08-31 Multi-Stage Fracture 1064.60 1064.70 0
2017-08-31 Multi-Stage Fracture 1041.00 1041.10 0
2017-08-30 Multi-Stage Fracture 2231.70 2231.80 0
2017-08-30 Multi-Stage Fracture 2195.90 2196.00 0
2017-08-30 Multi-Stage Fracture 2171.80 2171.90 0
2017-08-30 Multi-Stage Fracture 2136.30 2136.40 0
2017-08-30 Multi-Stage Fracture 2112.20 2112.30 0
2017-08-30 Multi-Stage Fracture 2088.20 2088.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-30 2017-08-31 764 1,578 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 72.6876 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.5499 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0537 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1528 N/A
Ethylene glycol 107-21-1 100 0.1528 N/A
Potassium Carbonate 584-08-7 100 0.1528 N/A
Potassium Hydroxide 1310-58-3 100 0.1528 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3069 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0651 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0651 N/A
water 7732-18-5 100 0.0651 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-17 2017-08-17 Surface Water - Runoff 1720

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2661 0.0 0.0 0.0
2018 8245 0.0 0.0 0.0
2019 8457 0.0 0.0 0.0
2020 1932 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-11 No Incident Encountered 0.00 0.00
2017-09-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References