X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032805000

Well Details

Well ID: 0344032805000
Loading map...
Location: 00/05-28-034-03W4/0
Location Alias: 00/05-28-34-03 W4M
Location Alias 2: 00/05-28-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 28
County/Municipality: Special Areas No. 4
Well Name: RHE 100 PROVOST 5-28-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0496096
License Date: 2019-10-18
License Status: Issued
Spud Date: 2019-12-16
Final Drill Date: 2020-02-05
Well Total Depth: 2524.00 m
Surface Hole Latitude: 51.940892
Surface Hole Longitude: -110.356889

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-03 Tempco Drilling Company Inc. 6 Drill To LD
2019-12-16 Predator Drilling Inc. 27 Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-03 446.00 Deviate (5 - 79 degrees)
2020-02-04 997.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-08 Multi-Stage Fracture 2466.80 2466.90 0
2020-03-08 Multi-Stage Fracture 2195.10 2195.20 0
2020-03-08 Multi-Stage Fracture 2155.50 2155.60 0
2020-03-08 Multi-Stage Fracture 2129.60 2129.70 0
2020-03-08 Multi-Stage Fracture 2091.00 2091.10 0
2020-03-08 Multi-Stage Fracture 2054.20 2054.30 0
2020-03-08 Multi-Stage Fracture 2029.60 2029.70 0
2020-03-08 Multi-Stage Fracture 1991.00 1991.10 0
2020-03-08 Multi-Stage Fracture 1965.20 1965.30 0
2020-03-08 Multi-Stage Fracture 1924.90 1925.00 0
2020-03-08 Multi-Stage Fracture 1883.50 1883.60 0
2020-03-08 Multi-Stage Fracture 2440.80 2440.90 0
2020-03-08 Multi-Stage Fracture 1828.90 1829.00 0
2020-03-08 Multi-Stage Fracture 1803.70 1803.80 0
2020-03-08 Multi-Stage Fracture 1703.30 1703.40 0
2020-03-08 Multi-Stage Fracture 1676.40 1676.50 0
2020-03-08 Multi-Stage Fracture 1649.10 1649.20 0
2020-03-08 Multi-Stage Fracture 1608.70 1608.80 0
2020-03-08 Multi-Stage Fracture 1580.50 1580.60 0
2020-03-08 Multi-Stage Fracture 1553.50 1553.60 0
2020-03-08 Multi-Stage Fracture 1512.40 1512.50 0
2020-03-08 Multi-Stage Fracture 1498.80 1498.90 0
2020-03-08 Multi-Stage Fracture 2416.40 2416.50 0
2020-03-08 Multi-Stage Fracture 1443.30 1443.40 0
2020-03-08 Multi-Stage Fracture 1415.60 1415.70 0
2020-03-08 Multi-Stage Fracture 1374.70 1374.80 0
2020-03-08 Multi-Stage Fracture 1361.20 1361.30 0
2020-03-08 Multi-Stage Fracture 1305.80 1305.90 0
2020-03-08 Multi-Stage Fracture 1264.60 1264.70 0
2020-03-08 Multi-Stage Fracture 1209.70 1209.80 0
2020-03-08 Multi-Stage Fracture 1181.90 1182.00 0
2020-03-09 Multi-Stage Fracture 1154.20 1154.30 0
2020-03-09 Multi-Stage Fracture 1126.30 1126.40 0
2020-03-08 Multi-Stage Fracture 2374.40 2374.50 0
2020-03-08 Multi-Stage Fracture 2349.60 2349.70 0
2020-03-08 Multi-Stage Fracture 2324.90 2325.00 0
2020-03-08 Multi-Stage Fracture 2285.30 2285.40 0
2020-03-08 Multi-Stage Fracture 2260.40 2260.50 0
2020-03-08 Multi-Stage Fracture 2222.10 2222.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 468 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-05 No Incident Encountered 0.00 0.00
2020-03-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References