X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032804020

Well Details

Well ID: 0344032804020
Loading map...
Location: 02/04-28-034-03W4/0
Location Alias: 02/04-28-34-03 W4M
Location Alias 2: 02/04-28-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 28
County/Municipality: Special Areas No. 4
Well Name: RHE 102 PROVOST 4-28-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0496095
License Date: 2019-10-18
License Status: Issued
Spud Date: 2019-12-15
Final Drill Date: 2020-01-29
Well Total Depth: 2392.00 m
Surface Hole Latitude: 51.940892
Surface Hole Longitude: -110.357107

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-15 Predator Drilling Inc. 27 Set Surface
2020-01-27 Tempco Drilling Company Inc. 6 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-28 406.80 Deviate (5 - 79 degrees)
2020-01-29 892.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-07 Multi-Stage Fracture 2331.80 2331.90 0
2020-03-07 Multi-Stage Fracture 2012.90 2013.00 0
2020-03-07 Multi-Stage Fracture 1973.90 1974.00 0
2020-03-07 Multi-Stage Fracture 1948.30 1948.40 0
2020-03-07 Multi-Stage Fracture 1870.90 1871.00 0
2020-03-07 Multi-Stage Fracture 1844.00 1844.10 0
2020-03-07 Multi-Stage Fracture 1805.40 1805.50 0
2020-03-07 Multi-Stage Fracture 1767.50 1767.60 0
2020-03-07 Multi-Stage Fracture 1678.70 1678.80 0
2020-03-07 Multi-Stage Fracture 1657.10 1657.20 0
2020-03-07 Multi-Stage Fracture 1632.20 1632.30 0
2020-03-07 Multi-Stage Fracture 2280.80 2280.90 0
2020-03-07 Multi-Stage Fracture 1594.60 1594.70 0
2020-03-07 Multi-Stage Fracture 1567.70 1567.80 0
2020-03-07 Multi-Stage Fracture 1541.40 1541.50 0
2020-03-07 Multi-Stage Fracture 1504.00 1504.10 0
2020-03-07 Multi-Stage Fracture 1426.10 1426.20 0
2020-03-07 Multi-Stage Fracture 1400.10 1400.20 0
2020-03-07 Multi-Stage Fracture 1373.30 1373.40 0
2020-03-07 Multi-Stage Fracture 1335.10 1335.20 0
2020-03-07 Multi-Stage Fracture 1309.70 1309.80 0
2020-03-07 Multi-Stage Fracture 1283.80 1283.90 0
2020-03-07 Multi-Stage Fracture 2254.20 2254.30 0
2020-03-07 Multi-Stage Fracture 1245.30 1245.40 0
2020-03-07 Multi-Stage Fracture 1219.00 1219.10 0
2020-03-08 Multi-Stage Fracture 1194.00 1194.10 0
2020-03-08 Multi-Stage Fracture 1155.30 1155.40 0
2020-03-08 Multi-Stage Fracture 1130.00 1130.10 0
2020-03-08 Multi-Stage Fracture 1103.70 1103.80 0
2020-03-08 Multi-Stage Fracture 1065.70 1065.80 0
2020-03-08 Multi-Stage Fracture 1039.30 1039.40 0
2020-03-08 Multi-Stage Fracture 1013.20 1013.30 0
2020-03-08 Multi-Stage Fracture 974.20 974.30 0
2020-03-07 Multi-Stage Fracture 2204.70 2204.80 0
2020-03-08 Multi-Stage Fracture 949.00 949.10 0
2020-03-07 Multi-Stage Fracture 2166.40 2166.50 0
2020-03-07 Multi-Stage Fracture 2139.00 2139.10 0
2020-03-07 Multi-Stage Fracture 2101.00 2101.10 0
2020-03-07 Multi-Stage Fracture 2074.50 2074.60 0
2020-03-07 Multi-Stage Fracture 2037.80 2037.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 496 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-29 No Incident Encountered 0.00 0.00
2020-03-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References