X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032608020

Well Details

Well ID: 0344032608020
Loading map...
Location: 02/08-26-034-03W4/0
Location Alias: 02/08-26-34-03 W4M
Location Alias 2: 02/08-26-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 26
County/Municipality: Special Areas No. 4
Well Name: RHE 102 HZ PROVOST 8-26-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0489081
License Date: 2018-05-08
License Status: Issued
Spud Date: 2018-05-31
Final Drill Date: 2018-07-11
Well Total Depth: 2600.00 m
Surface Hole Latitude: 51.949275
Surface Hole Longitude: -110.341140

For data sources see[1][2]

Well History

Date Event
2018-05-08 Obtained License
2018-05-31 Surface Casing Operation Performed
2018-07-08 Direction Drilling Operation Performed - Deviate
2018-07-09 Direction Drilling Operation Performed - Horizontal
2018-07-10 Well Log Performed
2018-07-11 Finished Drilling
2018-07-11 Production Casing Operation Performed
2018-07-11 Rig Released
2018-07-11 Well Mode changed to Drilled and Cased
2018-07-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-31 Well Began Production
2018-07-31 Well Fluid changed to Crude Oil
2018-07-31 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-08 Precision Drilling Corporation 292 N/A Drill To LD
2018-05-31 Predator Drilling Inc. 8 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-08 370.00 Deviate (5 - 79 degrees)
2018-07-09 879.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-21 Multi-Stage Fracture 2515.70 2515.80 0
2018-07-22 Multi-Stage Fracture 2218.70 2218.80 0
2018-07-22 Multi-Stage Fracture 2177.70 2177.80 0
2018-07-22 Multi-Stage Fracture 2151.60 2151.70 0
2018-07-22 Multi-Stage Fracture 2113.90 2114.00 0
2018-07-22 Multi-Stage Fracture 2085.90 2086.00 0
2018-07-22 Multi-Stage Fracture 2058.50 2058.60 0
2018-07-22 Multi-Stage Fracture 2031.40 2031.50 0
2018-07-22 Multi-Stage Fracture 2004.40 2004.50 0
2018-07-22 Multi-Stage Fracture 1966.60 1966.70 0
2018-07-22 Multi-Stage Fracture 1941.40 1941.50 0
2018-07-21 Multi-Stage Fracture 2488.40 2488.50 0
2018-07-22 Multi-Stage Fracture 1900.40 1900.50 0
2018-07-22 Multi-Stage Fracture 1849.20 1849.30 0
2018-07-22 Multi-Stage Fracture 1822.20 1822.30 0
2018-07-22 Multi-Stage Fracture 1781.40 1781.50 0
2018-07-22 Multi-Stage Fracture 1756.50 1756.60 0
2018-07-22 Multi-Stage Fracture 1716.80 1716.90 0
2018-07-22 Multi-Stage Fracture 1691.40 1691.50 0
2018-07-22 Multi-Stage Fracture 1650.60 1650.70 0
2018-07-22 Multi-Stage Fracture 1624.30 1624.40 0
2018-07-22 Multi-Stage Fracture 1583.30 1583.40 0
2018-07-21 Multi-Stage Fracture 2447.90 2448.00 0
2018-07-22 Multi-Stage Fracture 1557.20 1557.30 0
2018-07-22 Multi-Stage Fracture 1496.80 1496.90 0
2018-07-22 Multi-Stage Fracture 1471.50 1471.60 0
2018-07-22 Multi-Stage Fracture 1445.40 1445.50 0
2018-07-22 Multi-Stage Fracture 1419.10 1419.20 0
2018-07-22 Multi-Stage Fracture 1392.00 1392.10 0
2018-07-22 Multi-Stage Fracture 1368.20 1368.30 0
2018-07-22 Multi-Stage Fracture 1302.90 1303.00 0
2018-07-22 Multi-Stage Fracture 1276.20 1276.30 0
2018-07-22 Multi-Stage Fracture 1252.00 1252.10 0
2018-07-21 Multi-Stage Fracture 2408.30 2408.40 0
2018-07-22 Multi-Stage Fracture 1226.50 1226.60 0
2018-07-21 Multi-Stage Fracture 2380.60 2380.70 0
2018-07-22 Multi-Stage Fracture 2354.80 2354.90 0
2018-07-22 Multi-Stage Fracture 2314.20 2314.30 0
2018-07-22 Multi-Stage Fracture 2286.80 2286.90 0
2018-07-22 Multi-Stage Fracture 2246.00 2246.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-21 2018-07-22 766 1,733 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 72.1306 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 10.8904 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.092 N/A
water 7732-18-5 100 0.092 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0386 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1466 N/A
Ethylene glycol 107-21-1 100 0.1466 N/A
Potassium Carbonate 584-08-7 100 0.1466 N/A
Potassium Hydroxide 1310-58-3 100 0.1466 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3066 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0592 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0592 N/A
water 7732-18-5 100 0.0592 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-13 2018-07-13 Surface Water - Runoff 1602
2018-07-13 2018-07-13 Surface Water - Runoff 148

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3666 0.0 0.0 0.0
2019 8548 0.0 0.0 0.0
2020 2068 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-11 No Incident Encountered 0.00 0.00
2018-07-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References