X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032313000

Well Details

Well ID: 0344032313000
Loading map...
Location: 00/13-23-034-03W4/0
Location Alias: 00/13-23-34-03 W4M
Location Alias 2: 00/13-23-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 23
County/Municipality: Special Areas No. 4
Well Name: RHE 100 PROVOST 13-23-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0491920
License Date: 2018-11-09
License Status: Issued
Spud Date: 2019-10-17
Final Drill Date: 2019-10-21
Well Total Depth: 2289.00 m
Surface Hole Latitude: 51.924467
Surface Hole Longitude: -110.334008

For data sources see[1][2]

Well History

Date Event
2018-11-09 Obtained License
2019-10-16 Set Surface
2019-10-18 Surface Casing Operation Performed
2019-10-19 Drill To LD
2019-10-20 Direction Drilling Operation Performed - Deviate
2019-10-20 Direction Drilling Operation Performed - Horizontal
2019-10-21 Finished Drilling
2019-10-21 Well Mode changed to Drilled and Cased
2019-10-22 Production Casing Operation Performed
2019-10-22 Rig Released
2019-10-22 Well Log Performed
2019-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-10 Well Began Production
2019-11-10 Well Fluid changed to Crude Oil
2019-11-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-16 Predator Drilling Inc. 27 Set Surface
2019-10-19 Precision Drilling Corporation 292 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-10-20 492.80 Deviate (5 - 79 degrees)
2019-10-20 864.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-04 Multi-Stage Fracture 2230.90 2231.00 0
2019-11-05 Multi-Stage Fracture 1942.30 1942.40 0
2019-11-05 Multi-Stage Fracture 1902.90 1903.00 0
2019-11-05 Multi-Stage Fracture 1864.20 1864.30 0
2019-11-05 Multi-Stage Fracture 1840.10 1840.20 0
2019-11-05 Multi-Stage Fracture 1801.00 1801.10 0
2019-11-05 Multi-Stage Fracture 1761.60 1761.70 0
2019-11-05 Multi-Stage Fracture 1735.10 1735.20 0
2019-11-05 Multi-Stage Fracture 1696.20 1696.30 0
2019-11-05 Multi-Stage Fracture 1669.70 1669.80 0
2019-11-05 Multi-Stage Fracture 1642.90 1643.00 0
2019-11-05 Multi-Stage Fracture 2205.10 2205.20 0
2019-11-05 Multi-Stage Fracture 1603.90 1604.00 0
2019-11-05 Multi-Stage Fracture 1579.20 1579.30 0
2019-11-05 Multi-Stage Fracture 1539.60 1539.70 0
2019-11-05 Multi-Stage Fracture 1513.10 1513.20 0
2019-11-05 Multi-Stage Fracture 1474.90 1475.00 0
2019-11-05 Multi-Stage Fracture 1448.80 1448.90 0
2019-11-05 Multi-Stage Fracture 1409.80 1409.90 0
2019-11-05 Multi-Stage Fracture 1382.50 1382.60 0
2019-11-05 Multi-Stage Fracture 1345.60 1345.70 0
2019-11-05 Multi-Stage Fracture 1318.10 1318.20 0
2019-11-05 Multi-Stage Fracture 2178.00 2178.10 0
2019-11-05 Multi-Stage Fracture 1278.90 1279.00 0
2019-11-05 Multi-Stage Fracture 1241.00 1241.10 0
2019-11-05 Multi-Stage Fracture 1213.30 1213.40 0
2019-11-05 Multi-Stage Fracture 1174.20 1174.30 0
2019-11-05 Multi-Stage Fracture 1146.70 1146.80 0
2019-11-05 Multi-Stage Fracture 1106.90 1107.00 0
2019-11-05 Multi-Stage Fracture 1079.90 1080.00 0
2019-11-05 Multi-Stage Fracture 1041.00 1041.10 0
2019-11-05 Multi-Stage Fracture 1000.10 1000.20 0
2019-11-05 Multi-Stage Fracture 934.00 934.10 0
2019-11-05 Multi-Stage Fracture 2138.40 2138.50 0
2019-11-05 Multi-Stage Fracture 907.70 907.80 0
2019-11-05 Multi-Stage Fracture 868.10 868.20 0
2019-11-05 Multi-Stage Fracture 2112.50 2112.60 0
2019-11-05 Multi-Stage Fracture 2073.30 2073.40 0
2019-11-05 Multi-Stage Fracture 2047.00 2047.10 0
2019-11-05 Multi-Stage Fracture 2008.60 2008.70 0
2019-11-05 Multi-Stage Fracture 1981.80 1981.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-04 2019-11-05 743 1,643 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 70.8265 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.2782 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0455 N/A
water 7732-18-5 100 0.0455 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0256 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1539 N/A
Ethylene glycol 107-21-1 100 0.1539 N/A
Potassium Carbonate 584-08-7 100 0.1539 N/A
Potassium Hydroxide 1310-58-3 100 0.1539 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.332 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0598 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0598 N/A
water 7732-18-5 100 0.0598 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-10-29 2019-11-03 Surface Water - Runoff 1915

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1256 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-21 No Incident Encountered 0.00 0.00
2019-11-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References