X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032102000

Well Details

Well ID: 0344032102000
Loading map...
Location: 00/02-21-034-03W4/0
Location Alias: 00/02-21-34-03 W4M
Location Alias 2: 00/02-21-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 21
County/Municipality: Special Areas No. 4
Well Name: RHE HZ PROVOST 2-21-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0489623
License Date: 2018-06-20
License Status: Issued
Spud Date: 2018-07-03
Final Drill Date: 2018-07-15
Well Total Depth: 2338.00 m
Surface Hole Latitude: 51.940874
Surface Hole Longitude: -110.363925

For data sources see[1][2]

Well History

Date Event
2018-06-20 Obtained License
2018-07-04 Surface Casing Operation Performed
2018-07-12 Direction Drilling Operation Performed - Deviate
2018-07-13 Direction Drilling Operation Performed - Horizontal
2018-07-14 Well Log Performed
2018-07-15 Finished Drilling
2018-07-15 Production Casing Operation Performed
2018-07-15 Rig Released
2018-07-15 Well Mode changed to Drilled and Cased
2018-07-18 Well Log Performed
2018-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-03 Well Began Production
2018-08-03 Well Fluid changed to Crude Oil
2018-08-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-03 Predator Drilling Inc. 27 N/A Set Surface
2018-07-12 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-12 411.30 Deviate (5 - 79 degrees)
2018-07-13 885.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-29 Multi-Stage Fracture 2284.80 2284.90 0
2018-07-29 Multi-Stage Fracture 2002.00 2002.10 0
2018-07-29 Multi-Stage Fracture 1955.50 1955.60 0
2018-07-29 Multi-Stage Fracture 1917.90 1918.00 0
2018-07-29 Multi-Stage Fracture 1893.70 1893.80 0
2018-07-29 Multi-Stage Fracture 1857.20 1857.30 0
2018-07-29 Multi-Stage Fracture 1823.40 1823.50 0
2018-07-29 Multi-Stage Fracture 1797.50 1797.60 0
2018-07-29 Multi-Stage Fracture 1762.90 1763.00 0
2018-07-29 Multi-Stage Fracture 1712.20 1712.30 0
2018-07-29 Multi-Stage Fracture 1664.30 1664.40 0
2018-07-29 Multi-Stage Fracture 2258.80 2258.90 0
2018-07-29 Multi-Stage Fracture 1627.50 1627.60 0
2018-07-29 Multi-Stage Fracture 1589.00 1589.10 0
2018-07-29 Multi-Stage Fracture 1538.80 1538.90 0
2018-07-29 Multi-Stage Fracture 1514.90 1515.00 0
2018-07-29 Multi-Stage Fracture 1492.40 1492.50 0
2018-07-29 Multi-Stage Fracture 1467.10 1467.20 0
2018-07-29 Multi-Stage Fracture 1393.10 1393.20 0
2018-07-29 Multi-Stage Fracture 1306.20 1306.30 0
2018-07-29 Multi-Stage Fracture 1280.90 1281.00 0
2018-07-29 Multi-Stage Fracture 1256.60 1256.70 0
2018-07-29 Multi-Stage Fracture 2221.30 2221.40 0
2018-07-30 Multi-Stage Fracture 1157.90 1158.00 0
2018-07-30 Multi-Stage Fracture 1134.30 1134.40 0
2018-07-30 Multi-Stage Fracture 1108.90 1109.00 0
2018-07-30 Multi-Stage Fracture 1084.80 1084.90 0
2018-07-30 Multi-Stage Fracture 1059.70 1059.80 0
2018-07-30 Multi-Stage Fracture 1036.70 1036.80 0
2018-07-30 Multi-Stage Fracture 963.70 963.80 0
2018-07-30 Multi-Stage Fracture 940.60 940.70 0
2018-07-30 Multi-Stage Fracture 900.90 901.00 0
2018-07-29 Multi-Stage Fracture 2194.90 2195.00 0
2018-07-29 Multi-Stage Fracture 2156.60 2156.70 0
2018-07-29 Multi-Stage Fracture 2130.80 2130.90 0
2018-07-29 Multi-Stage Fracture 2092.10 2092.20 0
2018-07-29 Multi-Stage Fracture 2066.00 2066.10 0
2018-07-29 Multi-Stage Fracture 2027.70 2027.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-29 2018-07-30 745 1,555 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 71.1584 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.093 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0963 N/A
water 7732-18-5 100 0.0963 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.043 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1492 N/A
Ethylene glycol 107-21-1 100 0.1492 N/A
Potassium Carbonate 584-08-7 100 0.1492 N/A
Potassium Hydroxide 1310-58-3 100 0.1492 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3049 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0619 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0619 N/A
water 7732-18-5 100 0.0619 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-24 2018-07-27 Surface Water - Runoff 1378
2018-07-24 2018-07-27 Surface Water - Runoff 247

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3632 0.0 0.0 0.0
2019 8613 0.0 0.0 0.0
2020 2058 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-15 No Incident Encountered 0.00 0.00
2018-07-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References