X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344032101020

Well Details

Well ID: 0344032101020
Loading map...
Location: 02/01-21-034-03W4/0
Location Alias: 02/01-21-34-03 W4M
Location Alias 2: 02/01-21-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 21
County/Municipality: Special Areas No. 4
Well Name: RHE 102 HZ PROVOST 1-21-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0489622
License Date: 2018-06-20
License Status: Issued
Spud Date: 2018-07-04
Final Drill Date: 2018-07-17
Well Total Depth: 2311.00 m
Surface Hole Latitude: 51.940874
Surface Hole Longitude: -110.363707

For data sources see[1][2]

Well History

Date Event
2018-06-20 Obtained License
2018-07-05 Surface Casing Operation Performed
2018-07-16 Direction Drilling Operation Performed - Deviate
2018-07-16 Direction Drilling Operation Performed - Horizontal
2018-07-17 Finished Drilling
2018-07-17 Well Log Performed
2018-07-18 Production Casing Operation Performed
2018-07-18 Rig Released
2018-07-18 Well Mode changed to Drilled and Cased
2018-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-03 Well Began Production
2018-08-03 Well Fluid changed to Crude Oil
2018-08-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-04 Predator Drilling Inc. 8 N/A Set Surface
2018-07-15 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-16 513.00 Deviate (5 - 79 degrees)
2018-07-16 830.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-28 Multi-Stage Fracture 2256.10 2256.20 0
2018-07-28 Multi-Stage Fracture 1898.30 1898.40 0
2018-07-28 Multi-Stage Fracture 1858.80 1858.90 0
2018-07-28 Multi-Stage Fracture 1832.80 1832.90 0
2018-07-28 Multi-Stage Fracture 1806.40 1806.50 0
2018-07-28 Multi-Stage Fracture 1766.90 1767.00 0
2018-07-28 Multi-Stage Fracture 1740.40 1740.50 0
2018-07-28 Multi-Stage Fracture 1713.80 1713.90 0
2018-07-28 Multi-Stage Fracture 1687.50 1687.60 0
2018-07-28 Multi-Stage Fracture 1661.00 1661.10 0
2018-07-29 Multi-Stage Fracture 1595.70 1595.80 0
2018-07-28 Multi-Stage Fracture 2205.00 2205.10 0
2018-07-29 Multi-Stage Fracture 1569.20 1569.30 0
2018-07-29 Multi-Stage Fracture 1491.40 1491.50 0
2018-07-29 Multi-Stage Fracture 1465.70 1465.80 0
2018-07-29 Multi-Stage Fracture 1429.00 1429.10 0
2018-07-29 Multi-Stage Fracture 1402.80 1402.90 0
2018-07-29 Multi-Stage Fracture 1376.40 1376.50 0
2018-07-29 Multi-Stage Fracture 1349.90 1350.00 0
2018-07-29 Multi-Stage Fracture 1310.40 1310.50 0
2018-07-29 Multi-Stage Fracture 1285.80 1285.90 0
2018-07-29 Multi-Stage Fracture 1259.30 1259.40 0
2018-07-28 Multi-Stage Fracture 2140.70 2140.80 0
2018-07-29 Multi-Stage Fracture 1233.20 1233.30 0
2018-07-29 Multi-Stage Fracture 1194.00 1194.10 0
2018-07-29 Multi-Stage Fracture 1156.00 1156.10 0
2018-07-29 Multi-Stage Fracture 1117.80 1117.90 0
2018-07-29 Multi-Stage Fracture 1080.00 1080.10 0
2018-07-29 Multi-Stage Fracture 1029.70 1029.80 0
2018-07-29 Multi-Stage Fracture 1003.80 1003.90 0
2018-07-29 Multi-Stage Fracture 964.00 964.10 0
2018-07-29 Multi-Stage Fracture 941.30 941.40 0
2018-07-28 Multi-Stage Fracture 2089.80 2089.90 0
2018-07-28 Multi-Stage Fracture 2049.90 2050.00 0
2018-07-28 Multi-Stage Fracture 2013.50 2013.60 0
2018-07-28 Multi-Stage Fracture 1988.00 1988.10 0
2018-07-28 Multi-Stage Fracture 1964.10 1964.20 0
2018-07-28 Multi-Stage Fracture 1924.80 1924.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-28 2018-07-29 744 1,625 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 71.8769 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.74 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0944 N/A
water 7732-18-5 100 0.0944 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0304 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1491 N/A
Ethylene glycol 107-21-1 100 0.1491 N/A
Potassium Carbonate 584-08-7 100 0.1491 N/A
Potassium Hydroxide 1310-58-3 100 0.1491 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3066 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0623 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0623 N/A
water 7732-18-5 100 0.0623 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-24 2018-07-27 Surface Water - Runoff 1391
2018-07-24 2018-07-27 Surface Water - Runoff 249

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3632 0.0 0.0 0.0
2019 8631 0.0 0.0 0.0
2020 2043 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-18 No Incident Encountered 0.00 0.00
2018-07-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References