X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344031512000

Well Details

Well ID: 0344031512000
Loading map...
Location: 00/12-15-034-03W4/0
Location Alias: 00/12-15-34-03 W4M
Location Alias 2: 00/12-15-034-03 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 03
Section: 15
County/Municipality: Special Areas No. 4
Well Name: RHE HZ PROVOST 12-15-34-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0489608
License Date: 2018-06-19
License Status: Issued
Spud Date: 2018-07-09
Final Drill Date: 2018-07-26
Well Total Depth: 2463.00 m
Surface Hole Latitude: 51.923883
Surface Hole Longitude: -110.334008

For data sources see[1][2]

Well History

Date Event
2018-06-19 Obtained License
2018-07-09 Surface Casing Operation Performed
2018-07-23 Direction Drilling Operation Performed - Deviate
2018-07-24 Direction Drilling Operation Performed - Horizontal
2018-07-25 Well Log Performed
2018-07-26 Finished Drilling
2018-07-26 Production Casing Operation Performed
2018-07-26 Rig Released
2018-07-26 Well Mode changed to Drilled and Cased
2018-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-17 Well Began Production
2018-08-17 Well Fluid changed to Crude Oil
2018-08-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-09 Predator Drilling Inc. 8 N/A Set Surface
2018-07-23 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-23 420.30 Deviate (5 - 79 degrees)
2018-07-24 920.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-06 Multi-Stage Fracture 2404.50 2404.60 0
2018-08-06 Multi-Stage Fracture 2099.00 2099.10 0
2018-08-06 Multi-Stage Fracture 2072.50 2072.60 0
2018-08-06 Multi-Stage Fracture 2031.40 2031.50 0
2018-08-06 Multi-Stage Fracture 2004.00 2004.10 0
2018-08-06 Multi-Stage Fracture 1963.90 1964.00 0
2018-08-06 Multi-Stage Fracture 1911.30 1911.40 0
2018-08-06 Multi-Stage Fracture 1884.60 1884.70 0
2018-08-06 Multi-Stage Fracture 1844.70 1844.80 0
2018-08-06 Multi-Stage Fracture 1817.90 1818.00 0
2018-08-06 Multi-Stage Fracture 1778.00 1778.10 0
2018-08-06 Multi-Stage Fracture 2377.20 2377.30 0
2018-08-06 Multi-Stage Fracture 1750.00 1750.10 0
2018-08-06 Multi-Stage Fracture 1722.10 1722.20 0
2018-08-06 Multi-Stage Fracture 1682.80 1682.90 0
2018-08-06 Multi-Stage Fracture 1655.90 1656.00 0
2018-08-06 Multi-Stage Fracture 1615.00 1615.10 0
2018-08-06 Multi-Stage Fracture 1587.70 1587.80 0
2018-08-06 Multi-Stage Fracture 1495.90 1496.00 0
2018-08-06 Multi-Stage Fracture 1469.40 1469.50 0
2018-08-06 Multi-Stage Fracture 1429.20 1429.30 0
2018-08-06 Multi-Stage Fracture 1401.60 1401.70 0
2018-08-06 Multi-Stage Fracture 2351.40 2351.50 0
2018-08-07 Multi-Stage Fracture 1374.80 1374.90 0
2018-08-07 Multi-Stage Fracture 1294.50 1294.60 0
2018-08-07 Multi-Stage Fracture 1267.20 1267.30 0
2018-08-07 Multi-Stage Fracture 1225.70 1225.80 0
2018-08-07 Multi-Stage Fracture 1148.70 1148.80 0
2018-08-07 Multi-Stage Fracture 1122.20 1122.30 0
2018-08-07 Multi-Stage Fracture 1095.30 1095.40 0
2018-08-07 Multi-Stage Fracture 1041.90 1042.00 0
2018-08-07 Multi-Stage Fracture 1015.30 1015.40 0
2018-08-06 Multi-Stage Fracture 2310.50 2310.60 0
2018-08-06 Multi-Stage Fracture 2282.80 2282.90 0
2018-08-06 Multi-Stage Fracture 2243.40 2243.50 0
2018-08-06 Multi-Stage Fracture 2216.90 2217.00 0
2018-08-06 Multi-Stage Fracture 2190.40 2190.50 0
2018-08-06 Multi-Stage Fracture 2163.80 2163.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-06 2018-08-07 744 1,631 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 72.209 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.579 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0901 N/A
water 7732-18-5 100 0.0901 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0345 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.141 N/A
Ethylene glycol 107-21-1 100 0.141 N/A
Potassium Carbonate 584-08-7 100 0.141 N/A
Potassium Hydroxide 1310-58-3 100 0.141 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3096 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0575 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0575 N/A
water 7732-18-5 100 0.0575 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-31 2018-08-04 Surface Water - Runoff 1800

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3304 0.0 0.0 0.0
2019 8621 0.0 0.0 0.0
2020 2137 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-26 No Incident Encountered 0.00 0.00
2018-08-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References