X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335100103000

Well Details

Well ID: 0335100103000
Loading map...
Location: 00/03-01-033-10W5/0
Location Alias: 00/03-01-33-10 W5M
Location Alias 2: 00/03-01-033-10 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 10
Section: 01
County/Municipality: Clearwater County
Well Name: SHELL 2 LIMESTONE 3-1-33-10
Operator Name: Shell Canada Limited
License Number: 0068980
License Date: 1978-03-27
License Status: Issued
Spud Date: 1978-02-27
Final Drill Date: 1978-07-30
Well Total Depth: 4190.00 m
Surface Hole Latitude: 51.798138
Surface Hole Longitude: -115.288903

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-27 Obtained License
1978-07-30 Finished Drilling
1978-08-03 Liner Casing Operation Performed
1978-09-29 Perforation Treatment Performed - Jet Perforation
1978-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-05 Perforation Treatment Performed - Alcohol Squeeze
1978-10-08 Perforation Treatment Performed - Cement Squeeze
1978-10-10 Perforation Treatment Performed - Jet Perforation
1978-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-14 Perforation Treatment Performed - Alcohol Squeeze
1978-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-20 Perforation Treatment Performed - Alcohol Squeeze
1978-10-25 Perforation Treatment Performed - Jet Perforation
1978-10-27 Perforation Treatment Performed - Fractured
1978-11-15 Perforation Treatment Performed - Cement Squeeze
1978-11-19 Perforation Treatment Performed - Jet Perforation
1978-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-23 Perforation Treatment Performed - Acid Wash - No Pressure
1978-12-06 Perforation Treatment Performed - Jet Perforation
1978-12-08 Perforation Treatment Performed - Acid Wash - No Pressure
1979-01-09 Perforation Treatment Performed - Jet Perforation
1979-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1984-09-03 Well Mode changed to Drilled and Cased
1985-07-30 Well Fluid changed to Gas
1985-07-30 Well Mode changed to Testing
1985-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-31 Plug Back Performed
1985-07-31 Well Fluid changed to Gas
1985-07-31 Well Mode changed to Abandoned Zone
1985-08-07 Perforation Treatment Performed - Jet Perforation
1985-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-10 Perforation Treatment Performed - Fractured
1985-08-15 Perforation Treatment Performed - Fractured
2017-05-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-29 Perforation 792.40 795.40 15
1978-10-14 Alchohol Squeeze 3956.00 3992.00 0
1978-10-16 Acid Treatment 3956.00 3992.00 0
1978-10-20 Alchohol Squeeze 3956.00 3992.00 0
1978-10-25 Perforation 3956.00 3992.00 3
1978-10-27 Fracture 3956.00 3992.00 0
1978-11-15 Cement Squeeze 3956.00 3992.00 0
1978-11-19 Perforation 3898.00 3909.00 7
1978-11-19 Perforation 3914.00 3921.00 7
1978-11-19 Perforation 3928.00 3938.00 7
1978-11-20 Acid Treatment 3898.00 3938.00 0
1978-09-29 Perforation 4024.00 4044.00 7
1978-11-23 Acid Wash 3898.00 3938.00 0
1978-12-06 Perforation 3090.00 3093.00 7
1978-12-06 Perforation 3094.50 3097.00 7
1978-12-08 Acid Wash 3090.00 3097.00 0
1979-01-09 Perforation 2892.60 2896.20 3
1979-01-09 Perforation 2898.60 2916.90 3
1979-01-10 Acid Wash 2892.60 2916.90 0
1985-07-31 Packing Device Capped w/Cement 3809.00 3817.00 0
1985-08-07 Perforation 3700.00 3704.00 7
1985-08-07 Perforation 3707.00 3718.00 7
1978-09-30 Acid Treatment 4024.00 4044.00 0
1985-08-07 Perforation 3725.00 3730.00 7
1985-08-07 Perforation 3730.00 3736.00 3
1985-08-07 Perforation 3736.00 3746.00 3
1985-08-08 Acid Treatment 3700.00 3746.00 0
1985-08-10 Fracture 3700.00 3746.00 0
1985-08-15 Fracture 3700.00 3746.00 0
1978-10-03 Acid Treatment 4024.00 4044.00 0
1978-10-05 Alchohol Squeeze 4024.00 4044.00 0
1978-10-08 Cement Squeeze 4024.00 4044.00 0
1978-10-10 Perforation 3956.00 3992.00 3
1978-10-11 Acid Treatment 3956.00 3992.00 0
1978-10-12 Acid Treatment 3956.00 3992.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 24 0.0 0.0 0.0

For data sources see[5]

References