X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335071607000

Well Details

Well ID: 0335071607000
Loading map...
Location: 00/07-16-033-07W5/0
Location Alias: 00/07-16-33-07 W5M
Location Alias 2: 00/07-16-033-07 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 07
Section: 16
County/Municipality: Mountain View County
Well Name: PC RICINUS 7-16-33-7
Operator Name: TAQA North Ltd.
License Number: 0114097
License Date: 1985-03-25
License Status: Amended
Spud Date: 1985-03-25
Final Drill Date: 1985-05-04
Well Total Depth: 3037.00 m
Surface Hole Latitude: 51.828917
Surface Hole Longitude: -114.937493

For data sources see[1][2]

Well History

Date Event
1985-03-25 Obtained License
1985-04-01 Surface Casing Operation Performed
1985-04-03 Direction Drilling Operation Performed - Deviate
1985-05-04 Finished Drilling
1985-05-04 Well Log Performed
1985-05-07 Production Casing Operation Performed
1985-05-08 Rig Released
1985-05-10 Well Log Performed
1985-05-11 Well Log Performed
1985-05-31 Well Log Performed
1985-06-06 Perforation Treatment Performed - Jet Perforation
1985-06-06 Well Log Performed
1985-06-25 Well Mode changed to Drilled and Cased
1985-07-12 Well Began Production
1985-07-12 Well Fluid changed to Gas
1985-07-12 Well Mode changed to Flowing
1985-07-30 Well Log Performed
1985-10-28 Well Log Performed
1985-11-04 Well Log Performed
1985-11-15 Perforation Treatment Performed - Jet Perforation
1985-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-28 Perforation Treatment Performed - Cement Squeeze
1985-11-28 Plug Back Performed
2015-04-01 Well Fluid changed to Gas
2015-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-04-03 497.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-06 Perforation 2764.00 2783.00 13
1985-06-06 Perforation 2786.00 2789.00 13
1985-06-06 Perforation 2791.00 2816.00 13
1985-11-15 Perforation 2421.50 2425.50 13
1985-11-15 Perforation 2423.10 2427.00 13
1985-11-17 Acid Treatment 2421.50 2427.00 0
1985-11-28 Cement Squeeze 2421.50 2427.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2872 0.0 0.0 0.0
1986 5213 0.0 0.0 0.0
1987 1783 0.0 0.0 0.0
1988 2 0.0 0.0 0.0
1989 2177 0.0 0.0 0.0
1990 2976 0.0 0.0 0.0
1991 5714 0.0 0.0 0.0
1992 5841 0.0 0.0 0.0
1993 7865 0.0 0.0 0.0
1994 8651 0.0 0.0 0.0
1995 8190 0.0 0.0 0.0
1996 8615 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 7590 0.0 0.0 0.0
1999 8726 0.0 0.0 0.0
2000 8766 0.0 0.0 0.0
2001 8700 0.0 0.0 0.0
2002 8511 0.0 0.0 0.0
2003 8607 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8637 0.0 0.0 0.0
2006 8749 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8250 0.0 0.0 0.0
2009 8300 0.0 0.0 0.0
2010 8491 0.0 0.0 0.0
2011 8559 0.0 0.0 0.0
2012 8409 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8727 0.0 0.0 0.0
2015 8640 0.0 0.0 0.0
2016 8210 0.0 0.0 0.0
2017 8633 0.0 0.0 0.0
2018 8661 0.0 0.0 0.0
2019 8325 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[6]

References