X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335070905000

Well Details

Well ID: 0335070905000
Loading map...
Location: 00/05-09-033-07W5/0
Location Alias: 00/05-09-33-07 W5M
Location Alias 2: 00/05-09-033-07 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 07
Section: 09
County/Municipality: Mountain View County
Well Name: TQN RICINUS 5-9-33-7
Operator Name: TAQA North Ltd.
License Number: 0102344
License Date: 1983-07-22
License Status: Amended
Spud Date: 1983-07-27
Final Drill Date: 1983-09-30
Well Total Depth: 3071.00 m
Surface Hole Latitude: 51.811931
Surface Hole Longitude: -114.941275

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-22 Obtained License
1983-07-27 Direction Drilling Operation Performed - 98
1983-09-30 Finished Drilling
1983-10-03 Production Casing Operation Performed
1983-10-25 Perforation Treatment Performed - Jet Perforation
1983-10-26 Perforation Treatment Performed - Fractured
1983-10-26 Perforation Treatment Performed - Jet Perforation
1983-10-29 Perforation Treatment Performed - Fractured
1983-11-07 Well Mode changed to Drilled and Cased
1983-11-09 Perforation Treatment Performed - Jet Perforation
1983-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-12 Perforation Treatment Performed - Cement Squeeze
1983-11-15 Perforation Treatment Performed - Jet Perforation
1983-11-16 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-07-27 1059.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-25 Perforation 2850.00 2860.00 13
1983-11-16 Fracture 2086.00 2103.00 0
1983-10-26 Perforation 2844.00 2846.00 13
1983-10-26 Fracture 2844.00 2860.00 0
1983-10-29 Fracture 2844.00 2860.00 0
1983-11-09 Perforation 2330.00 2337.00 13
1983-11-10 Acid Treatment 2330.00 2337.00 0
1983-11-12 Cement Squeeze 2330.00 2337.00 0
1983-11-15 Perforation 2086.00 2092.00 13
1983-11-15 Perforation 2096.00 2103.00 13

For data sources see[5]



References