X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335031915000

Well Details

Well ID: 0335031915000
Loading map...
Location: 00/15-19-033-03W5/0
Location Alias: 00/15-19-33-03 W5M
Location Alias 2: 00/15-19-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 19
County/Municipality: Mountain View County
Well Name: MOBIL HARME 11-19-33-3
Operator Name: ExxonMobil Canada Resources Company
License Number: 0078938
License Date: 1979-10-30
License Status: Amended
Spud Date: 1979-11-19
Final Drill Date: 1979-12-17
Well Total Depth: 2610.00 m
Surface Hole Latitude: 51.850053
Surface Hole Longitude: -114.409253

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-30 Obtained License
1979-12-17 Finished Drilling
1979-12-17 Well Mode changed to Drilled and Cased
1979-12-18 Drill Stem Test Performed
1979-12-19 Drill Stem Test Performed
1979-12-20 Drill Stem Test Performed
1979-12-22 Production Casing Operation Performed
1980-02-05 Perforation Treatment Performed - Jet Perforation
1980-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-11 Perforation Treatment Performed - Cement Plug
1980-02-11 Perforation Treatment Performed - Jet Perforation
1980-02-13 Perforation Treatment Performed - Fractured
1980-02-29 Perforation Treatment Performed - Jet Perforation
1980-03-03 Perforation Treatment Performed - Fractured
1980-04-19 Well Began Production
1980-04-19 Well Fluid changed to Crude Oil
1980-04-19 Well Mode changed to Pumping
1981-11-10 Well Fluid changed to Crude Oil
1981-11-10 Well Mode changed to Suspended
1990-12-12 Well Fluid changed to Crude Oil
1990-12-12 Well Mode changed to Pumping
1990-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-13 Perforation Treatment Performed - Jet Perforation
1990-12-13 Plug Back Performed
1990-12-13 Well Fluid changed to Crude Oil
1990-12-13 Well Log Performed
1990-12-13 Well Mode changed to Abandoned and Re-entered
1990-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-14 Plug Back Performed
1990-12-15 Well Abandoned
1995-01-21 Perforation Treatment Performed - Jet Perforation
1995-01-22 Perforation Treatment Performed - Cement Squeeze
1995-01-22 Plug Back Performed
1995-01-24 Perforation Treatment Performed - Jet Perforation
1995-01-30 Perforation Treatment Performed - Cement Squeeze
1995-01-30 Plug Back Performed
1995-02-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-05 Perforation 2564.80 2566.20 12
1990-12-13 Perforation 550.00 552.00 13
1990-12-14 Packing Device Capped w/Cement 538.00 546.00 0
1995-01-21 Perforation 550.00 552.00 13
1995-01-22 Cement Squeeze 550.00 552.00 0
1995-01-24 Perforation 2020.50 2024.50 13
1995-01-30 Cement Squeeze 2020.50 2024.50 0
1980-02-05 Perforation 2569.50 2572.00 12
1980-02-06 Acid Treatment 2564.80 2572.00 0
1980-02-11 Cement Plug 2520.00 2535.00 0
1980-02-11 Perforation 2020.50 2024.50 12
1980-02-13 Fracture 2020.50 2024.50 0
1980-02-29 Perforation 2020.50 2024.50 13
1980-03-03 Fracture 2020.50 2024.50 0
1990-12-13 Packing Device Capped w/Cement 1997.00 2005.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 402 0.0 0.0 0.0
1981 711 0.0 0.0 0.0
1990 2 0.0 0.0 0.0

For data sources see[5]

References