X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334262215000

Well Details

Well ID: 0334262215000
Loading map...
Location: 00/15-22-033-26W4/0
Location Alias: 00/15-22-33-26 W4M
Location Alias 2: 00/15-22-033-26 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 26
Section: 22
County/Municipality: Kneehill County
Well Name: MOBIL WIMBORNE 15-22-33-26
Operator Name: ExxonMobil Canada Ltd.
License Number: 0022197
License Date: 1962-03-05
License Status: RecCertified
Spud Date: 1962-03-12
Final Drill Date: 1962-04-11
Well Total Depth: 2289.00 m
Surface Hole Latitude: 51.850735
Surface Hole Longitude: -113.603691

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-03-05 Obtained License
1962-04-11 Finished Drilling
1962-04-11 Well Mode changed to Drilled and Cased
1962-04-12 Drill Stem Test Performed
1962-04-14 Production Casing Operation Performed
1962-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-16 Perforation Treatment Performed - Jet Perforation
1962-04-19 Well Began Production
1962-04-19 Well Fluid changed to Crude Oil
1962-04-19 Well Mode changed to Flowing
1962-12-03 Lost Circulation Occurred
1967-02-28 Well Fluid changed to Crude Oil
1967-02-28 Well Mode changed to Suspended
1967-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-03-13 Well Fluid changed to Crude Oil
1967-03-13 Well Mode changed to Abandoned Zone
1967-03-15 Perforation Treatment Performed - Jet Perforation
1967-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-10 Plug Back Performed
1990-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-04-16 Perforation 2263.40 2267.70 7
1962-04-16 Acid Treatment 2263.40 2267.70 0
1967-03-13 Packing Device Capped w/Cement 2241.80 2249.40 0
1967-03-15 Perforation 1606.60 1610.60 7
1967-03-18 Acid Treatment 1606.60 1610.60 0
1990-03-10 Packing Device Capped w/Cement 1535.00 1599.00 0
1990-03-13 Packing Device Capped w/Cement 625.00 646.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-12-03 Lost Circulation 12.80 40.80

For data sources see[6]

References