If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334261415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.836353,"lon":-113.580651,"icon":""}]} |
Location: 00/15-14-033-26W4/0 | |
Location Alias: 00/15-14-33-26 W4M | |
Location Alias 2: 00/15-14-033-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 26 | |
Section: 14 | |
County/Municipality: Kneehill County | |
Well Name: MOBIL OIL WIMBOURNE S 15-14-33-26 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0013652 | |
License Date: 1957-07-05 | |
License Status: RecCertified | |
Spud Date: 1957-07-10 | |
Final Drill Date: 1957-08-18 | |
Well Total Depth: 2306.40 m | |
Surface Hole Latitude: 51.836353 | |
Surface Hole Longitude: -113.580651 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-07-05 | Obtained License |
1957-07-20 | Drill Stem Test Performed |
1957-08-10 | Drill Stem Test Performed |
1957-08-17 | Drill Stem Test Performed |
1957-08-18 | Finished Drilling |
1957-08-18 | Well Mode changed to Drilled and Cased |
1957-08-20 | Drill Stem Test Performed |
1957-08-21 | Drill Stem Test Performed |
1957-08-22 | Production Casing Operation Performed |
1957-08-23 | Well Log Performed |
1957-08-24 | Perforation Treatment Performed - Jet Perforation |
1957-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-09-04 | Well Began Production |
1957-09-04 | Well Fluid changed to Crude Oil |
1957-09-04 | Well Mode changed to Flowing |
1968-06-01 | Well Fluid changed to Crude Oil |
1968-06-01 | Well Mode changed to Pumping |
1971-11-02 | Well Fluid changed to Crude Oil |
1971-11-02 | Well Mode changed to Suspended |
1973-05-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1973-05-28 | Perforation Treatment Performed - Jet Perforation |
1973-06-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-06-06 | Well Fluid changed to Crude Oil |
1973-06-06 | Well Mode changed to Flowing |
1975-01-01 | Well Fluid changed to Crude Oil |
1975-01-01 | Well Mode changed to Suspended |
1975-06-19 | Well Fluid changed to Crude Oil |
1975-06-19 | Well Mode changed to Flowing |
1976-02-12 | Perforation Treatment Performed - Cement Squeeze |
1976-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-02-13 | Perforation Treatment Performed - Jet Perforation |
1982-02-11 | Well Fluid changed to Crude Oil |
1982-02-11 | Well Mode changed to Gas Lift |
1983-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-12-31 | Well Fluid changed to Crude Oil |
1986-12-31 | Well Mode changed to Suspended |
1988-08-04 | Well Log Performed |
1989-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-10-12 | Plug Back Performed |
1989-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-10-13 | Perforation Treatment Performed - Cement Plug |
1989-10-13 | Plug Back Performed |
1989-10-13 | Well Abandoned |
1989-10-13 | Well Fluid changed to Crude Oil |
1989-10-13 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-08-24 | Perforation | 2280.50 | 2281.40 | 13 |
1989-10-12 | Packing Device Capped w/Cement | 2151.00 | 2251.60 | 0 |
1989-10-13 | Cement Plug | 1460.00 | 1550.00 | 0 |
1989-10-13 | Packing Device Capped w/Cement | 722.00 | 730.00 | 0 |
1957-08-26 | Acid Treatment | 2280.50 | 2281.40 | 0 |
1973-05-28 | Packing Device Capped w/Cement | 2278.10 | 2279.60 | 0 |
1973-05-28 | Perforation | 2275.60 | 2276.90 | 13 |
1973-06-06 | Acid Treatment | 2275.60 | 2276.90 | 0 |
1976-02-12 | Cement Squeeze | 2275.60 | 2276.90 | 0 |
1976-02-13 | Perforation | 2269.40 | 2271.40 | 7 |
1976-02-13 | Acid Treatment | 2269.40 | 2271.40 | 0 |
1983-01-25 | Acid Treatment | 2269.40 | 2271.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 1481 | 0.0 | 0.0 | 0.0 |
1968 | 3069 | 0.0 | 0.0 | 0.0 |
1969 | 1516 | 0.0 | 0.0 | 0.0 |
1970 | 1584 | 0.0 | 0.0 | 0.0 |
1973 | 4056 | 0.0 | 0.0 | 0.0 |
1976 | 7016 | 0.0 | 0.0 | 0.0 |
1977 | 4951 | 0.0 | 0.0 | 0.0 |
1981 | 864 | 0.0 | 0.0 | 0.0 |
1983 | 7734 | 0.0 | 0.0 | 0.0 |
1984 | 5895 | 0.0 | 0.0 | 0.0 |
1985 | 744 | 0.0 | 0.0 | 0.0 |
1986 | 1052 | 0.0 | 0.0 | 0.0 |
For data sources see[5]