X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334260401000

Well Details

Well ID: 0334260401000
Loading map...
Location: 00/01-04-033-26W4/0
Location Alias: 00/01-04-33-26 W4M
Location Alias 2: 00/01-04-033-26 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 26
Section: 04
County/Municipality: Kneehill County
Well Name: ANDERSON ET AL W1M 1-4-33-26
Operator Name: Devon Canada Corporation
License Number: 0012499
License Date: 1956-10-19
License Status: Abandoned
Spud Date: 1956-10-24
Final Drill Date: 1956-12-11
Well Total Depth: 2257.00 m
Surface Hole Latitude: 51.796416
Surface Hole Longitude: -113.622079

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-10-19 Obtained License
1956-11-06 Drill Stem Test Performed
1956-11-26 Drill Stem Test Performed
1956-11-29 Drill Stem Test Performed
1956-12-02 Drill Stem Test Performed
1956-12-04 Drill Stem Test Performed
1956-12-09 Drill Stem Test Performed
1956-12-11 Finished Drilling
1956-12-11 Well Mode changed to Drilled and Cased
1956-12-13 Production Casing Operation Performed
1956-12-16 Perforation Treatment Performed - Jet Perforation
1956-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-19 Well Began Production
1956-12-19 Well Fluid changed to Crude Oil
1956-12-19 Well Mode changed to Flowing
1957-07-25 Perforation Treatment Performed - Jet Perforation
1957-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-26 Perforation Treatment Performed - Cement Squeeze
1957-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-28 Perforation Treatment Performed - Cement Squeeze
1957-07-28 Perforation Treatment Performed - Jet Perforation
1957-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-30 Perforation Treatment Performed - Cement Squeeze
1957-07-30 Perforation Treatment Performed - Jet Perforation
1957-08-01 Perforation Treatment Performed - Jet Perforation
1957-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-08-02 Perforation Treatment Performed - Cement Squeeze
1957-08-03 Perforation Treatment Performed - Jet Perforation
1957-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-08-07 Perforation Treatment Performed - Cement Squeeze
1957-08-08 Perforation Treatment Performed - Jet Perforation
1957-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-05 Well Fluid changed to Crude Oil
1960-01-05 Well Mode changed to Suspended
1963-10-07 Well Fluid changed to Crude Oil
1963-10-07 Well Mode changed to Flowing
1964-04-01 Well Fluid changed to Crude Oil
1964-04-01 Well Mode changed to Suspended
1972-09-09 Perforation Treatment Performed - Cement Squeeze
1972-09-11 Well Abandoned
1972-09-11 Well Fluid changed to Crude Oil
1972-09-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-12-16 Perforation 2235.70 2236.60 26
1957-07-30 Acid Treatment 2237.50 2238.10 0
1957-07-30 Cement Squeeze 2237.50 2238.10 0
1957-08-01 Perforation 2238.80 2240.30 13
1957-08-02 Acid Treatment 2238.80 2240.30 0
1957-08-02 Cement Squeeze 2238.80 2240.30 0
1957-08-03 Perforation 2234.80 2235.70 13
1957-08-05 Acid Treatment 2234.80 2235.70 0
1957-08-07 Cement Squeeze 2234.80 2235.70 0
1957-08-08 Perforation 2235.70 2236.60 13
1957-08-09 Acid Treatment 2235.70 2236.60 0
1956-12-18 Acid Treatment 2235.70 2236.60 0
1957-08-11 Acid Treatment 2235.70 2236.60 0
1957-08-13 Acid Treatment 2235.70 2236.60 0
1972-09-09 Cement Squeeze 2235.70 2236.60 0
1957-07-25 Perforation 2237.50 2238.10 13
1957-07-26 Acid Treatment 2235.70 2238.10 0
1957-07-26 Cement Squeeze 2235.70 2238.10 0
1957-07-28 Perforation 2237.50 2238.10 13
1957-07-28 Acid Treatment 2237.50 2238.10 0
1957-07-28 Cement Squeeze 2237.50 2238.10 0
1957-07-30 Perforation 2237.50 2238.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References