If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334251816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.837572,"lon":-113.527815,"icon":""}]} |
Location: 00/16-18-033-25W4/0 | |
Location Alias: 00/16-18-33-25 W4M | |
Location Alias 2: 00/16-18-033-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Kneehill County | |
Well Name: NORTHROCK WIM 16-18-33-25 | |
Operator Name: TAQA North Ltd. | |
License Number: 0360333 | |
License Date: 2006-07-18 | |
License Status: Amended | |
Spud Date: 2006-07-31 | |
Final Drill Date: 2006-08-05 | |
Well Total Depth: 1807.00 m | |
Surface Hole Latitude: 51.837572 | |
Surface Hole Longitude: -113.527815 |
Date | Event |
---|---|
2006-07-18 | Obtained License |
2006-08-01 | Surface Casing Operation Performed |
2006-08-04 | Direction Drilling Operation Performed - Deviate |
2006-08-05 | Finished Drilling |
2006-08-05 | Well Log Performed |
2006-08-05 | Well Mode changed to Drilled and Cased |
2006-08-06 | Production Casing Operation Performed |
2006-08-07 | Rig Released |
2006-08-22 | Perforation Treatment Performed - Jet Perforation |
2006-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-24 | Plug Back Performed |
2006-08-24 | Well Mode changed to Abandoned Zone |
2006-08-25 | Perforation Treatment Performed - Jet Perforation |
2006-09-10 | Perforation Treatment Performed - Jet Perforation |
2006-09-11 | Perforation Treatment Performed - Fractured |
2006-10-12 | Perforation Treatment Performed - Jet Perforation |
2006-10-12 | Perforation Treatment Performed - Remedial Casing |
2006-10-17 | Well Log Performed |
2006-10-18 | Perforation Treatment Performed - Jet Perforation |
2006-10-18 | Perforation Treatment Performed - Remedial Casing |
2006-10-18 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-08-04 | 1446.60 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-08-22 | Perforation | 1790.00 | 1793.00 | 20 |
2006-10-18 | Remedial Casing Cementing | 429.00 | 430.00 | 0 |
2006-08-24 | Packing Device Capped w/Cement | 1787.10 | 1789.10 | 0 |
2006-08-25 | Perforation | 1780.50 | 1782.00 | 17 |
2006-08-25 | Perforation | 1775.00 | 1776.50 | 17 |
2006-09-10 | Perforation | 1766.00 | 1770.00 | 17 |
2006-09-11 | Fracture | 1766.00 | 1770.00 | 0 |
2006-10-12 | Perforation | 564.00 | 565.00 | 13 |
2006-10-12 | Remedial Casing Cementing | 564.00 | 565.00 | 0 |
2006-10-18 | Perforation | 429.00 | 430.00 | 13 |
For data sources see[5]