If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334150210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.795936,"lon":-112.007764,"icon":""}]} |
Location: 00/10-02-033-15W4/0 | |
Location Alias: 00/10-02-33-15 W4M | |
Location Alias 2: 00/10-02-033-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 15 | |
Section: 02 | |
County/Municipality: Special Areas No. 2 | |
Well Name: INPLAY OIL 102 HZ HANNA 10-2-33-15 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0449190 | |
License Date: 2012-10-15 | |
License Status: Amended | |
Spud Date: 2012-11-12 | |
Final Drill Date: 2012-11-18 | |
Well Total Depth: 2235.00 m | |
Surface Hole Latitude: 51.795936 | |
Surface Hole Longitude: -112.007764 |
Date | Event |
---|---|
2012-10-15 | Obtained License |
2012-11-12 | Surface Casing Operation Performed |
2012-11-14 | Direction Drilling Operation Performed - Horizontal |
2012-11-18 | Finished Drilling |
2012-11-18 | Well Log Performed |
2012-11-18 | Well Mode changed to Drilled and Cased |
2012-11-20 | Production Casing Operation Performed |
2012-11-20 | Rig Released |
2012-11-26 | Well Log Performed |
2012-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-11 | Well Began Production |
2012-12-11 | Well Fluid changed to Crude Oil |
2012-12-11 | Well Mode changed to Pumping |
2014-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-14 | 949.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-05 | Multi-Stage Fracture | 2193.90 | 2194.30 | 0 |
2012-12-08 | Multi-Stage Fracture | 1826.80 | 1827.20 | 0 |
2012-12-08 | Multi-Stage Fracture | 1786.10 | 1786.50 | 0 |
2012-12-08 | Multi-Stage Fracture | 1744.70 | 1745.10 | 0 |
2012-12-08 | Multi-Stage Fracture | 1703.90 | 1704.30 | 0 |
2012-12-08 | Multi-Stage Fracture | 1662.30 | 1662.70 | 0 |
2012-12-08 | Multi-Stage Fracture | 1621.50 | 1621.90 | 0 |
2012-12-08 | Multi-Stage Fracture | 1582.50 | 1582.90 | 0 |
2012-12-08 | Multi-Stage Fracture | 1542.20 | 1542.60 | 0 |
2012-12-08 | Multi-Stage Fracture | 1501.40 | 1501.80 | 0 |
2014-06-13 | Multi-Stage Fracture | 2071.00 | 2071.50 | 0 |
2012-12-05 | Multi-Stage Fracture | 2150.80 | 2151.20 | 0 |
2014-06-13 | Multi-Stage Fracture | 1976.00 | 1976.50 | 0 |
2014-06-13 | Multi-Stage Fracture | 1934.00 | 1934.50 | 0 |
2014-06-13 | Multi-Stage Fracture | 1886.00 | 1886.50 | 0 |
2014-06-13 | Multi-Stage Fracture | 1851.00 | 1851.50 | 0 |
2014-06-14 | Multi-Stage Fracture | 1811.00 | 1811.50 | 0 |
2014-06-14 | Multi-Stage Fracture | 1766.50 | 1767.00 | 0 |
2014-06-14 | Multi-Stage Fracture | 1681.00 | 1681.50 | 0 |
2014-06-14 | Multi-Stage Fracture | 1641.00 | 1641.50 | 0 |
2012-12-07 | Multi-Stage Fracture | 2110.40 | 2110.80 | 0 |
2012-12-07 | Multi-Stage Fracture | 2069.90 | 2070.30 | 0 |
2012-12-07 | Multi-Stage Fracture | 2029.10 | 2029.50 | 0 |
2012-12-07 | Multi-Stage Fracture | 1988.30 | 1988.70 | 0 |
2012-12-07 | Multi-Stage Fracture | 1948.20 | 1948.60 | 0 |
2012-12-07 | Multi-Stage Fracture | 1907.50 | 1907.90 | 0 |
2012-12-08 | Multi-Stage Fracture | 1867.20 | 1867.60 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-06-13 | 2014-06-14 | 1,175 | 1,227 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.0768 | N/A | |||
Sand (20/40) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 15.8124 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 15.8124 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 15.8124 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 15.8125 | N/A | ||||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 0.6107 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.6107 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.6107 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.6107 | N/A | ||||
HCL 15% | Canyon | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.3499 | N/A | |
Water | 7732-18-5 | 100 | 0.3499 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0172 | N/A | |
Water | 7732-18-5 | 100 | 0.0172 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0427 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0427 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.2161 | N/A | |
Water | 7732-18-5 | 100 | 0.2161 | N/A | ||||
CAN-1000 Corrosion Inhibitor | Canyon | Corrosion Inhibitor | Refer to MSDS | 8141 | 100 | 0.0011 | N/A | |
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.2171 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.2171 | N/A | ||||
Water | 7732-18-5 | 100 | 0.2171 | N/A | ||||
CAN-1200 Anti-Sludge Agent / Non-Emulsifier | Canyon | Demulsifier | Refer to MSDS | 8251 | 100 | 0.003 | N/A | |
CAN-2000 Gellant (Guar) | Canyon | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.5283 | N/A | |
CAN-1101 Iron Control Reduction | Canyon | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.0093 | N/A | |
Cupric Chloride | 7447-39-4 | 100 | 0.0093 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0093 | N/A | ||||
CAN-1202 Acid Wetting Agent | Canyon | Surfactant | 1-Methoxy-2-Propanol | 107-98-2 | 100 | 0.0032 | N/A | |
Water | 7732-18-5 | 100 | 0.0032 | N/A | ||||
CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.1115 | N/A | |
Methanol | 67-56-1 | 100 | 0.1115 | N/A | ||||
Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.1115 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1115 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-06-02 | 2014-06-03 | Surface Water - Runoff | 1552 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 120 | 0.0 | 0.0 | 0.0 |
2013 | 8085 | 0.0 | 0.0 | 0.0 |
2014 | 7523 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8727 | 0.0 | 0.0 | 0.0 |
2017 | 3228 | 0.0 | 0.0 | 0.0 |
2018 | 5780 | 0.0 | 0.0 | 0.0 |
2019 | 7825 | 0.0 | 0.0 | 0.0 |
2020 | 1972 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-20 | No Incident Encountered | 0.00 | 0.00 |
2012-12-30 | No Incident Encountered | 0.00 | 0.00 |
2014-06-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]