X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334143616000

Well Details

Well ID: 0334143616000
Loading map...
Location: 00/16-36-033-14W4/0
Location Alias: 00/16-36-33-14 W4M
Location Alias 2: 00/16-36-033-14 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 14
Section: 36
County/Municipality: Special Areas No. 2
Well Name: PRECAMB ET AL SULLVANLK 16-36-33-14
Operator Name: Enerplus Corporation
License Number: 0092285
License Date: 1981-09-18
License Status: RecCertified
Spud Date: 1981-09-22
Final Drill Date: 1981-09-26
Well Total Depth: 1210.00 m
Surface Hole Latitude: 51.878744
Surface Hole Longitude: -111.852610

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-18 Obtained License
1981-09-25 Drill Stem Test Performed
1981-09-26 Finished Drilling
1981-09-26 Well Log Performed
1981-09-26 Well Mode changed to Drilled and Cased
1981-09-27 Drill Stem Test Performed
1981-09-28 Production Casing Operation Performed
1982-01-19 Perforation Treatment Performed - Jet Perforation
1982-01-21 Perforation Treatment Performed - Jet Perforation
1982-02-03 Well Began Production
1982-02-03 Well Fluid changed to Crude Oil
1982-02-03 Well Mode changed to Flowing
1983-07-21 Perforation Treatment Performed - Jet Perforation
1983-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-31 Well Fluid changed to Crude Oil
1984-12-31 Well Mode changed to Suspended
1994-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-04 Perforation Treatment Performed - Jet Perforation
1994-06-04 Plug Back Performed
1994-06-04 Well Fluid changed to Crude Oil
1994-06-04 Well Mode changed to Abandoned
1994-06-05 Perforation Treatment Performed - Remedial Casing
1994-06-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-19 Perforation 1192.00 1194.50 7
1982-01-19 Perforation 1171.00 1173.00 7
1982-01-21 Perforation 1159.00 1164.00 7
1983-07-21 Perforation 1151.00 1154.00 10
1983-07-23 Acid Treatment 1151.00 1154.00 0
1994-06-04 Packing Device Capped w/Cement 1127.00 1135.00 0
1994-06-04 Perforation 360.00 361.00 7
1994-06-05 Remedial Casing Cementing 360.00 361.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 7675 0.0 0.0 0.0
1983 7150 0.0 0.0 0.0
1984 2904 0.0 0.0 0.0

For data sources see[5]

References