If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334092816002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.864149,"lon":-111.214353,"icon":""}]} |
Location: 00/16-28-033-09W4/2 | |
Location Alias: 00/16-28-33-09 W4M | |
Location Alias 2: 00/16-28-033-09 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 09 | |
Section: 28 | |
County/Municipality: Special Areas No. 4 | |
Well Name: BOW RIVER PROVOST 16-28-33-9 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0379302 | |
License Date: 2007-07-16 | |
License Status: Suspension | |
Spud Date: 2007-08-30 | |
Final Drill Date: 2007-09-02 | |
Well Total Depth: 1120.00 m | |
Surface Hole Latitude: 51.864149 | |
Surface Hole Longitude: -111.214353 |
Date | Event |
---|---|
2007-07-16 | Obtained License |
2007-08-31 | Surface Casing Operation Performed |
2007-09-01 | Direction Drilling Operation Performed - Deviate |
2007-09-02 | Finished Drilling |
2007-09-02 | Well Mode changed to Drilled and Cased |
2007-09-03 | Production Casing Operation Performed |
2007-09-03 | Rig Released |
2007-09-03 | Well Log Performed |
2007-09-06 | Perforation Treatment Performed - Jet Perforation |
2007-09-06 | Well Log Performed |
2008-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-21 | Perforation Treatment Performed - Jet Perforation |
2008-02-21 | Plug Back Performed |
2008-02-28 | Well Began Production |
2008-02-28 | Well Fluid changed to Gas |
2008-02-28 | Well Mode changed to Flowing |
2015-02-01 | Well Fluid changed to Gas |
2015-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-09-01 | 585.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-09-06 | Perforation | 1033.50 | 1034.30 | 17 |
2008-02-21 | Packing Device Capped w/Cement | 1026.00 | 1034.00 | 0 |
2008-02-21 | Perforation | 893.00 | 895.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7385 | 0.0 | 0.0 | 0.0 |
2009 | 7175 | 0.0 | 0.0 | 0.0 |
2010 | 8722 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 5111 | 0.0 | 0.0 | 0.0 |
For data sources see[6]