X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334090208002

Well Details

Well ID: 0334090208002
Loading map...
Location: 00/08-02-033-09W4/2
Location Alias: 00/08-02-33-09 W4M
Location Alias 2: 00/08-02-033-09 W4/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 09
Section: 02
County/Municipality: Special Areas No. 4
Well Name: RAPIDFIRE ET AL PROVOST 8-2-33-9
Operator Name: Fairwest Energy Corporation
License Number: 0162807
License Date: 1993-12-03
License Status: Abandoned
Spud Date: 1994-01-04
Final Drill Date: 1994-01-06
Well Total Depth: 1105.00 m
Surface Hole Latitude: 51.800221
Surface Hole Longitude: -111.163444

For data sources see[1][2]

Well History

Date Event
1993-12-03 Obtained License
1994-01-04 Surface Casing Operation Performed
1994-01-06 Finished Drilling
1994-01-06 Well Mode changed to Drilled and Cased
1994-01-07 Drill Stem Test Performed
1994-01-07 Well Log Performed
1994-01-08 Plug Back Performed
1994-01-09 Production Casing Operation Performed
1994-01-09 Rig Released
1994-04-25 Perforation Treatment Performed - Jet Perforation
1999-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-26 Perforation Treatment Performed - Jet Perforation
1999-08-26 Plug Back Performed
1999-08-26 Well Log Performed
1999-08-26 Well Mode changed to Drilled and Cased
2000-05-24 Perforation Treatment Performed - Jet Perforation
2000-05-24 Well Log Performed
2001-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-25 Plug Back Performed
2001-05-25 Well Abandoned
2001-05-25 Well Log Performed
2001-05-25 Well Mode changed to Abandoned
2002-10-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-25 Perforation 297.00 298.50 13
1999-08-26 Packing Device Capped w/Cement 241.00 249.00 0
1999-08-26 Perforation 222.00 224.00 13
2000-05-24 Perforation 146.00 148.00 13
2001-05-25 Packing Device Capped w/Cement 136.00 144.00 0

For data sources see[4]



References