X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334060705003

Well Details

Well ID: 0334060705003
Loading map...
Location: 00/05-07-033-06W4/3
Location Alias: 00/05-07-33-06 W4M
Location Alias 2: 00/05-07-033-06 W4/03
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 06
Section: 07
County/Municipality: Special Areas No. 4
Well Name: NCE PET ET AL PROVOST 5-7-33-6
Operator Name: Obsidian Energy Ltd.
License Number: 0176351
License Date: 1995-02-23
License Status: Suspension
Spud Date: 1995-02-28
Final Drill Date: 1995-03-03
Well Total Depth: 1015.00 m
Surface Hole Latitude: 51.814521
Surface Hole Longitude: -110.849927

For data sources see[1][2]

Well History

Date Event
1995-02-23 Obtained License
1995-03-01 Surface Casing Operation Performed
1995-03-03 Finished Drilling
1995-03-03 Well Log Performed
1995-03-03 Well Mode changed to Drilled and Cased
1995-03-04 Drill Stem Test Performed
1995-03-05 Production Casing Operation Performed
1995-03-06 Rig Released
1995-03-11 Perforation Treatment Performed - Jet Perforation
1995-03-11 Well Log Performed
1995-04-27 Well Log Performed
1995-04-28 Perforation Treatment Performed - Jet Perforation
1995-04-28 Well Log Performed
1995-10-22 Well Log Performed
1995-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-23 Plug Back Performed
1995-10-23 Well Log Performed
1995-10-24 Perforation Treatment Performed - Jet Perforation
1996-01-14 Well Began Production
1996-01-14 Well Fluid changed to Gas
1996-01-14 Well Mode changed to Flowing
1996-01-23 Well Fluid changed to Gas
1996-01-23 Well Mode changed to Flowing
1997-04-01 Well Fluid changed to Gas
1997-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-11 Perforation 989.50 990.50 17
1995-04-28 Perforation 978.00 979.00 17
1995-10-23 Packing Device Capped w/Cement 982.50 985.50 0
1995-10-24 Perforation 823.50 824.80 18
1995-10-24 Perforation 972.00 973.80 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3537 0.0 0.0 0.0

For data sources see[5]

References