X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334010302000

Well Details

Well ID: 0334010302000
Loading map...
Location: 00/02-03-033-01W4/0
Location Alias: 00/02-03-33-01 W4M
Location Alias 2: 00/02-03-033-01 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 01
Section: 03
County/Municipality: Special Areas No. 4
Well Name: PENN WEST ESTHER 2-3-33-1
Operator Name: Obsidian Energy Ltd.
License Number: 0186488
License Date: 1996-03-01
License Status: Suspension
Spud Date: 1996-03-03
Final Drill Date: 1996-03-16
Well Total Depth: 854.00 m
Surface Hole Latitude: 51.796999
Surface Hole Longitude: -110.059235

For data sources see[1][2]

Well History

Date Event
1996-03-01 Obtained License
1996-03-03 Surface Casing Operation Performed
1996-03-05 Direction Drilling Operation Performed - Deviate
1996-03-05 Water Flow Occurred
1996-03-14 Intermediate Casing Operation Performed
1996-03-15 Well Log Performed
1996-03-16 Finished Drilling
1996-03-16 Well Log Performed
1996-03-16 Well Mode changed to Drilled and Cased
1996-03-17 Production Casing Operation Performed
1996-03-17 Rig Released
1996-03-18 Well Log Performed
1996-04-04 Perforation Treatment Performed - Jet Perforation
1996-04-04 Well Log Performed
1996-04-07 Well Began Production
1996-04-07 Well Fluid changed to Crude Oil
1996-04-07 Well Mode changed to Flowing
2002-09-13 Well Fluid changed to Crude Oil
2002-09-13 Well Mode changed to Pumping
2010-07-19 Well Fluid changed to Crude Oil
2010-07-19 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-03-05 513.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-04 Perforation 812.00 816.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6059 0.0 0.0 0.0
1997 8738 0.0 0.0 0.0
1998 8450 0.0 0.0 0.0
1999 2924 0.0 0.0 0.0
2001 2109 0.0 0.0 0.0
2002 8451 0.0 0.0 0.0
2003 8082 0.0 0.0 0.0
2004 8701 0.0 0.0 0.0
2005 8416 0.0 0.0 0.0
2006 7748 0.0 0.0 0.0
2007 8240 0.0 0.0 0.0
2008 8279 0.0 0.0 0.0
2009 5236 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-03-05 Water Flow 776.00 788.00

For data sources see[7]

References