X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334010206000

Well Details

Well ID: 0334010206000
Loading map...
Location: 00/06-02-033-01W4/0
Location Alias: 00/06-02-33-01 W4M
Location Alias 2: 00/06-02-033-01 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 01
Section: 02
County/Municipality: Special Areas No. 4
Well Name: PENN WEST ESTHER 6-2-33-1
Operator Name: Obsidian Energy Ltd.
License Number: 0192119
License Date: 1996-10-08
License Status: Issued
Spud Date: 1996-10-12
Final Drill Date: 1996-10-13
Well Total Depth: 856.00 m
Surface Hole Latitude: 51.801191
Surface Hole Longitude: -110.040757

For data sources see[1][2]

Well History

Date Event
1996-10-08 Obtained License
1996-10-12 Surface Casing Operation Performed
1996-10-13 Finished Drilling
1996-10-13 Well Mode changed to Drilled and Cased
1996-10-14 Drill Stem Test Performed
1996-10-14 Well Log Performed
1996-10-15 Production Casing Operation Performed
1996-10-15 Rig Released
1996-10-22 Perforation Treatment Performed - Jet Perforation
1996-10-22 Perforation Treatment Performed - Remedial Casing
1996-10-22 Well Log Performed
1996-10-25 Perforation Treatment Performed - Jet Perforation
1996-10-25 Well Log Performed
1996-10-27 Perforation Treatment Performed - Jet Perforation
1996-11-01 Well Began Production
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Mode changed to Flowing
2002-09-13 Well Fluid changed to Crude Oil
2002-09-13 Well Mode changed to Pumping
2008-09-14 Well Fluid changed to Crude Oil
2008-09-14 Well Mode changed to Suspended
2018-07-27 Well Fluid changed to Crude Oil
2018-07-27 Well Mode changed to Pumping
2020-03-01 Well Fluid changed to Crude Oil
2020-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-22 Perforation 240.00 241.00 14
1996-10-22 Remedial Casing Cementing 240.00 241.00 0
1996-10-25 Perforation 810.00 813.00 14
1996-10-27 Perforation 813.00 815.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1419 0.0 0.0 0.0
1997 6551 0.0 0.0 0.0
1998 8382 0.0 0.0 0.0
1999 8494 0.0 0.0 0.0
2000 8603 0.0 0.0 0.0
2001 8647 0.0 0.0 0.0
2002 8703 0.0 0.0 0.0
2003 8737 0.0 0.0 0.0
2004 8758 0.0 0.0 0.0
2005 5202 0.0 0.0 0.0
2006 533 0.0 0.0 0.0
2018 51 0.0 0.0 0.0

For data sources see[5]

References