X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325103510000

Well Details

Well ID: 0325103510000
Loading map...
Location: 00/10-35-032-10W5/0
Location Alias: 00/10-35-32-10 W5M
Location Alias 2: 00/10-35-032-10 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 10
Section: 35
County/Municipality: Clearwater County
Well Name: SHELL 10 LIMESTONE 10-35-32-10
Operator Name: Shell Canada Limited
License Number: 0067224
License Date: 1977-12-05
License Status: Abandoned
Spud Date: 1977-12-12
Final Drill Date: 1978-04-19
Well Total Depth: 4221.50 m
Surface Hole Latitude: 51.786111
Surface Hole Longitude: -115.317258

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-05 Obtained License
1978-04-19 Finished Drilling
1978-04-22 Liner Casing Operation Performed
1978-05-26 Perforation Treatment Performed - Jet Perforation
1978-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-30 Perforation Treatment Performed - Jet Perforation
1978-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-12 Perforation Treatment Performed - Jet Perforation
1978-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-06-29 Perforation Treatment Performed - Jet Perforation
1978-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-30 Perforation Treatment Performed - Jet Perforation
1978-07-02 Perforation Treatment Performed - Fractured
1978-07-13 Well Mode changed to Drilled and Cased
1980-11-17 Well Began Production
1980-11-17 Well Fluid changed to Gas
1980-11-17 Well Mode changed to Flowing
2014-04-17 Perforation Treatment Performed - Cement Plug
2014-04-17 Plug Back Performed
2014-04-18 Perforation Treatment Performed - Cement Squeeze
2014-04-18 Perforation Treatment Performed - Jet Perforation
2014-04-18 Plug Back Performed
2014-04-20 Perforation Treatment Performed - Cement Squeeze
2014-04-20 Perforation Treatment Performed - Jet Perforation
2014-04-20 Plug Back Performed
2014-04-20 Well Log Performed
2014-04-21 Perforation Treatment Performed - Jet Perforation
2014-04-21 Well Log Performed
2014-04-22 Perforation Treatment Performed - Cement Squeeze
2014-04-22 Perforation Treatment Performed - Jet Perforation
2014-04-22 Plug Back Performed
2014-04-22 Well Log Performed
2014-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-04-24 Perforation Treatment Performed - Cement Squeeze
2014-04-24 Perforation Treatment Performed - Jet Perforation
2014-04-24 Plug Back Performed
2014-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-04-25 Perforation Treatment Performed - Cement Squeeze
2014-04-25 Plug Back Performed
2014-04-25 Well Fluid changed to Gas
2014-04-25 Well Mode changed to Abandoned Zone
2014-09-24 Well Abandoned
2014-09-24 Well Fluid changed to Gas
2014-09-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-05-26 Perforation 4002.00 4011.20 7
1978-06-30 Perforation 3093.70 3097.40 10
1978-06-30 Perforation 3099.80 3110.20 10
1978-06-30 Perforation 3113.20 3118.10 10
1978-06-30 Acid Treatment 3075.40 3118.10 0
1978-07-02 Fracture 3075.40 3118.10 0
2014-04-17 Cement Plug 2950.00 3000.00 0
2014-04-18 Perforation 2822.00 2823.00 17
2014-04-18 Perforation 2620.00 2621.00 17
2014-04-18 Perforation 2603.00 2604.00 17
2014-04-18 Cement Squeeze 2603.00 2823.00 0
1978-05-28 Acid Treatment 4002.00 4011.20 0
2014-04-20 Perforation 2242.00 2243.00 17
2014-04-20 Perforation 2246.00 2247.00 17
2014-04-20 Cement Squeeze 2242.00 2247.00 0
2014-04-21 Perforation 1867.00 1868.00 17
2014-04-21 Perforation 1805.00 1806.00 17
2014-04-22 Cement Squeeze 1805.00 1868.00 0
2014-04-22 Perforation 875.00 876.00 17
2014-04-24 Cement Squeeze 875.00 876.00 0
2014-04-24 Packing Device Capped w/Cement 839.00 870.00 0
2014-04-24 Perforation 600.00 603.00 17
1978-05-30 Perforation 4123.90 4136.10 7
2014-04-25 Cement Squeeze 600.00 603.00 0
2014-04-25 Packing Device Capped w/Cement 571.00 595.00 0
1978-05-31 Acid Treatment 4123.90 4136.10 0
1978-06-12 Perforation 3633.80 3643.00 7
1978-06-12 Perforation 3644.20 3647.80 7
1978-06-17 Acid Treatment 3633.80 3647.80 0
1978-06-29 Packing Device Capped w/Cement 3345.20 3352.80 0
1978-06-29 Perforation 3075.40 3091.30 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 729 0.0 0.0 0.0
1981 4654 0.0 0.0 0.0
1982 8234 0.0 0.0 0.0
1983 5954 0.0 0.0 0.0
1984 6588 0.0 0.0 0.0
1985 7160 0.0 0.0 0.0
1986 8307 0.0 0.0 0.0
1987 7471 0.0 0.0 0.0
1988 8264 0.0 0.0 0.0
1989 7725 0.0 0.0 0.0
1990 6247 0.0 0.0 0.0
1991 3856 0.0 0.0 0.0
1992 5312 0.0 0.0 0.0
1993 4650 0.0 0.0 0.0
1994 8594 0.0 0.0 0.0
1995 8680 0.0 0.0 0.0
1996 8370 0.0 0.0 0.0
1997 8337 0.0 0.0 0.0
1998 7707 0.0 0.0 0.0
1999 7152 0.0 0.0 0.0
2000 8385 0.0 0.0 0.0
2001 8432 0.0 0.0 0.0
2002 8627 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8742 0.0 0.0 0.0
2005 7781 0.0 0.0 0.0
2006 6862 0.0 0.0 0.0
2007 7116 0.0 0.0 0.0
2008 1576 0.0 0.0 0.0
2009 2532 0.0 0.0 0.0
2010 3308 0.0 0.0 0.0
2011 710 0.0 0.0 0.0
2012 1626 0.0 0.0 0.0
2013 739 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References