X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325063609003

Well Details

Well ID: 0325063609003
Loading map...
Location: 00/09-36-032-06W5/3
Location Alias: 00/09-36-32-06 W5M
Location Alias 2: 00/09-36-032-06 W5/03
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 06
Section: 36
County/Municipality: Mountain View County
Well Name: PWEI ET AL RICINUS 9-36-32-6
Operator Name: TAQA North Ltd.
License Number: 0281124
License Date: 2003-01-21
License Status: RecCertified
Spud Date: 2003-01-29
Final Drill Date: 2003-02-17
Well Total Depth: 2701.00 m
Surface Hole Latitude: 51.788303
Surface Hole Longitude: -114.715895

For data sources see[1][2]

Well History

Date Event
2003-01-21 Obtained License
2003-02-01 Surface Casing Operation Performed
2003-02-17 Finished Drilling
2003-02-17 Well Log Performed
2003-02-17 Well Mode changed to Drilled and Cased
2003-02-19 Production Casing Operation Performed
2003-02-20 Rig Released
2003-03-09 Well Log Performed
2003-03-10 Perforation Treatment Performed - Jet Perforation
2003-03-10 Well Log Performed
2003-03-11 Perforation Treatment Performed - Jet Perforation
2003-03-12 Well Log Performed
2003-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-13 Plug Back Performed
2003-03-14 Perforation Treatment Performed - Jet Perforation
2003-03-15 Perforation Treatment Performed - Fractured
2003-03-19 Perforation Treatment Performed - Fractured
2003-03-20 Well Log Performed
2003-03-21 Perforation Treatment Performed - Jet Perforation
2003-03-23 Perforation Treatment Performed - Fractured
2005-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-18 Perforation Treatment Performed - Jet Perforation
2005-09-18 Plug Back Performed
2005-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-30 Perforation Treatment Performed - Cement Squeeze
2005-09-30 Plug Back Performed
2005-09-30 Well Mode changed to Abandoned Zone
2014-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-03 Perforation Treatment Performed - Cement Squeeze
2014-06-03 Perforation Treatment Performed - Jet Perforation
2014-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-04 Perforation Treatment Performed - Cement Squeeze
2014-06-04 Perforation Treatment Performed - Jet Perforation
2014-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-05 Perforation Treatment Performed - Jet Perforation
2014-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-06 Perforation Treatment Performed - Cement Squeeze
2014-06-06 Plug Back Performed
2014-07-09 Well Abandoned
2014-07-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-10 Perforation 2539.00 2545.00 17
2003-03-21 Perforation 2372.50 2375.50 17
2003-03-23 Fracture 2372.50 2375.50 0
2005-09-18 Packing Device Capped w/Cement 2361.00 2369.00 0
2005-09-18 Perforation 654.00 656.00 17
2005-09-30 Cement Squeeze 654.00 656.00 0
2005-09-30 Packing Device Capped w/Cement 593.00 645.00 0
2014-05-30 Packing Device Capped w/Cement 1558.00 1565.00 0
2014-06-03 Perforation 1555.00 1568.00 20
2014-06-03 Cement Squeeze 1555.00 1568.00 0
2014-06-03 Packing Device Capped w/Cement 1532.00 1550.00 0
2003-03-11 Perforation 2531.00 2534.00 17
2014-06-04 Packing Device Capped w/Cement 1033.00 1037.00 0
2014-06-04 Perforation 1030.00 1033.00 20
2014-06-04 Cement Squeeze 1030.00 1033.00 0
2014-06-04 Packing Device Capped w/Cement 1007.00 1025.00 0
2014-06-05 Packing Device Capped w/Cement 654.00 662.00 0
2014-06-05 Packing Device Capped w/Cement 495.30 505.00 0
2014-06-05 Perforation 495.00 495.30 99
2014-06-06 Cement Squeeze 495.00 495.30 0
2014-06-06 Packing Device Capped w/Cement 481.00 490.00 0
2003-03-11 Perforation 2524.00 2529.00 17
2003-03-11 Perforation 2484.00 2488.00 17
2003-03-11 Perforation 2476.00 2481.00 17
2003-03-13 Packing Device Capped w/Cement 2459.20 2467.00 0
2003-03-14 Perforation 2373.00 2375.00 17
2003-03-15 Fracture 2373.00 2375.00 0
2003-03-19 Fracture 2373.00 2375.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-03 No Incident Encountered 0.00 0.00

For data sources see[5]

References