X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325043209002

Well Details

Well ID: 0325043209002
Loading map...
Location: 00/09-32-032-04W5/2
Location Alias: 00/09-32-32-04 W5M
Location Alias 2: 00/09-32-032-04 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 32
County/Municipality: Mountain View County
Well Name: NAL CAROL 9-32-32-4
Operator Name: NAL Resources Limited
License Number: 0021964
License Date: 1962-01-17
License Status: Suspension
Spud Date: 1962-01-24
Final Drill Date: 1962-02-27
Well Total Depth: 2734.10 m
Surface Hole Latitude: 51.789487
Surface Hole Longitude: -114.524357

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-01-17 Obtained License
1962-01-24 Lost Circulation Occurred
1962-02-27 Finished Drilling
1962-02-27 Well Mode changed to Drilled and Cased
1962-03-01 Production Casing Operation Performed
1962-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-02 Perforation Treatment Performed - Acid Wash - No Pressure
1962-03-02 Perforation Treatment Performed - Jet Perforation
1964-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-23 Perforation Treatment Performed - Acid Wash - No Pressure
1964-05-23 Perforation Treatment Performed - Jet Perforation
1986-06-30 Well Log Performed
1986-07-01 Well Log Performed
1986-07-02 Perforation Treatment Performed - Cement Squeeze
1986-07-14 Perforation Treatment Performed - Jet Perforation
1986-07-14 Well Log Performed
1986-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-08 Plug Back Performed
2003-11-09 Perforation Treatment Performed - Jet Perforation
2003-11-10 Perforation Treatment Performed - Fractured
2003-12-01 Well Began Production
2003-12-01 Well Fluid changed to Crude Oil
2003-12-01 Well Mode changed to Pumping
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-02 Perforation 2694.40 2696.30 7
1986-07-02 Cement Squeeze 2694.40 2712.10 0
1986-07-14 Perforation 2692.00 2693.50 13
1986-07-14 Perforation 2703.00 2703.50 13
1986-07-14 Perforation 2706.50 2707.00 13
1986-07-14 Perforation 2710.00 2711.00 13
1986-07-15 Acid Treatment 2692.00 2711.00 0
2003-11-08 Packing Device Capped w/Cement 2672.00 2680.00 0
2003-11-09 Perforation 2395.60 2398.60 17
2003-11-09 Perforation 2390.00 2393.00 17
2003-11-10 Fracture 2390.00 2398.60 0
1962-03-02 Perforation 2698.10 2698.70 13
1962-03-02 Perforation 2701.70 2703.00 7
1962-03-02 Acid Wash 2694.40 2703.00 0
1962-03-02 Acid Treatment 2694.40 2703.00 0
1964-05-23 Perforation 2705.40 2707.20 7
1964-05-23 Perforation 2709.70 2712.10 7
1964-05-23 Acid Wash 2694.40 2712.10 0
1964-05-23 Acid Treatment 2694.40 2712.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 744 0.0 0.0 0.0
2004 5545 0.0 0.0 0.0
2005 7890 0.0 0.0 0.0
2006 8315 0.0 0.0 0.0
2007 8250 0.0 0.0 0.0
2008 8031 0.0 0.0 0.0
2009 7499 0.0 0.0 0.0
2010 8681 0.0 0.0 0.0
2011 7960 0.0 0.0 0.0
2012 7607 0.0 0.0 0.0
2013 5440 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-01-24 Lost Circulation 6.10 78.00

For data sources see[6]

References