X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325043003000

Well Details

Well ID: 0325043003000
Loading map...
Location: 00/03-30-032-04W5/0
Location Alias: 00/03-30-32-04 W5M
Location Alias 2: 00/03-30-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 30
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 3-30-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0016977
License Date: 1959-04-29
License Status: Suspension
Spud Date: 1959-05-12
Final Drill Date: 1959-06-09
Well Total Depth: 2819.40 m
Surface Hole Latitude: 51.768425
Surface Hole Longitude: -114.558342

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-04-29 Obtained License
1959-06-09 Finished Drilling
1959-06-09 Well Mode changed to Drilled and Cased
1959-06-11 Production Casing Operation Performed
1959-06-17 Perforation Treatment Performed - Open-Hole Completion
1959-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-23 Well Began Production
1959-06-23 Well Fluid changed to Crude Oil
1959-06-23 Well Mode changed to Flowing
1959-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-22 Perforation Treatment Performed - Cement Squeeze
1959-11-22 Perforation Treatment Performed - Jet Perforation
1959-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-27 Perforation Treatment Performed - Visqueeze
1959-11-30 Perforation Treatment Performed - Jet Perforation
1960-03-24 Well Fluid changed to Crude Oil
1960-03-24 Well Mode changed to Suspended
1963-01-31 Perforation Treatment Performed - Open-Hole Completion
1963-03-02 Well Fluid changed to Crude Oil
1963-03-02 Well Mode changed to Pumping
1968-08-21 Perforation Treatment Performed - Open-Hole Completion
1968-08-29 Perforation Treatment Performed - Acid Wash - No Pressure
1972-02-23 Well Began Injection
1972-02-23 Well Fluid changed to Water
1972-02-23 Well Type changed to Injection
1976-09-11 Perforation Treatment Performed - Jet Perforation
1976-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-01 Well Fluid changed to Water
1984-04-01 Well Mode changed to Suspended
1984-04-01 Well Type changed to Injection
1989-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-06-17 Open Hole/Barefoot Completion 2788.90 2792.00 0
1968-08-21 Open Hole/Barefoot Completion 2788.90 2819.40 0
1968-08-29 Acid Wash 2788.90 2819.40 0
1976-09-11 Perforation 2785.90 2819.40 7
1976-09-12 Acid Treatment 2785.90 2819.40 0
1989-09-28 Packing Device Capped w/Cement 2756.00 2770.00 0
1959-06-19 Acid Treatment 2788.90 2792.00 0
1959-09-30 Acid Treatment 2788.90 2792.00 0
1959-11-22 Cement Squeeze 2788.90 2792.00 0
1959-11-22 Perforation 2786.20 2788.60 13
1959-11-23 Acid Treatment 2786.20 2788.60 0
1959-11-27 Visqueeze 2786.20 2788.60 0
1959-11-30 Perforation 2786.20 2788.30 13
1963-01-31 Open Hole/Barefoot Completion 2788.90 2798.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0

For data sources see[5]

References