If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325042604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.780922,"lon":-114.473183,"icon":""}]} |
Location: 00/04-26-032-04W5/0 | |
Location Alias: 00/04-26-32-04 W5M | |
Location Alias 2: 00/04-26-032-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 04 | |
Section: 26 | |
County/Municipality: Mountain View County | |
Well Name: EMCL / EMCW HZ HARME 4-26-32-4 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0446541 | |
License Date: 2012-06-14 | |
License Status: Amended | |
Spud Date: 2012-09-14 | |
Final Drill Date: 2012-09-24 | |
Well Total Depth: 3703.00 m | |
Surface Hole Latitude: 51.780922 | |
Surface Hole Longitude: -114.473183 |
Date | Event |
---|---|
2012-06-14 | Obtained License |
2012-09-15 | Surface Casing Operation Performed |
2012-09-16 | Well Log Performed |
2012-09-17 | Direction Drilling Operation Performed - Deviate |
2012-09-19 | Direction Drilling Operation Performed - Horizontal |
2012-09-24 | Finished Drilling |
2012-09-24 | Well Mode changed to Drilled and Cased |
2012-09-25 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-25 | Production Casing Operation Performed |
2012-09-26 | Rig Released |
2012-11-20 | Well Log Performed |
2012-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-02 | Well Began Production |
2012-12-02 | Well Fluid changed to Crude Oil |
2012-12-02 | Well Mode changed to Flowing |
2013-01-30 | Well Fluid changed to Crude Oil |
2013-01-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-13 | Nabors Drilling Limited | 30 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-17 | 1482.00 | Deviate (5 - 79 degrees) |
2012-09-19 | 2228.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-25 | Open Hole/Barefoot Completion | 3698.00 | 3703.00 | 0 |
2012-11-30 | Multi-Stage Fracture | 3676.30 | 3676.40 | 0 |
2012-12-01 | Multi-Stage Fracture | 3390.00 | 3600.60 | 0 |
2012-12-02 | Multi-Stage Fracture | 2376.60 | 3326.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 28 | 0.0 | 0.0 | 0.0 |
2013 | 4990 | 0.0 | 0.0 | 0.0 |
2014 | 7690 | 0.0 | 0.0 | 0.0 |
2015 | 7861 | 0.0 | 0.0 | 0.0 |
2016 | 8270 | 0.0 | 0.0 | 0.0 |
2017 | 8653 | 0.0 | 0.0 | 0.0 |
2018 | 7483 | 0.0 | 0.0 | 0.0 |
2019 | 8340 | 0.0 | 0.0 | 0.0 |
2020 | 1991 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-26 | No Incident Encountered | 0.00 | 0.00 |
2013-01-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]