X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325042511000

Well Details

Well ID: 0325042511000
Loading map...
Location: 00/11-25-032-04W5/0
Location Alias: 00/11-25-32-04 W5M
Location Alias 2: 00/11-25-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 25
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 11-25-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0020863
License Date: 1961-06-05
License Status: Suspension
Spud Date: 1961-06-08
Final Drill Date: 1961-07-09
Well Total Depth: 2630.40 m
Surface Hole Latitude: 51.774342
Surface Hole Longitude: -114.442672

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-05 Obtained License
1961-07-09 Finished Drilling
1961-07-09 Well Mode changed to Drilled and Cased
1961-07-10 Production Casing Operation Performed
1961-07-13 Perforation Treatment Performed - Open-Hole Completion
1961-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-07-22 Perforation Treatment Performed - Jet Perforation
1961-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-02 Perforation Treatment Performed - Jet Perforation
1961-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-05 Well Began Production
1961-08-05 Well Fluid changed to Crude Oil
1961-08-05 Well Mode changed to Flowing
1980-05-04 Well Fluid changed to Crude Oil
1980-05-04 Well Mode changed to Pumping
1985-04-08 Well Log Performed
1985-04-15 Perforation Treatment Performed - Cement Squeeze
1985-04-16 Perforation Treatment Performed - Jet Perforation
1985-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-28 Well Fluid changed to Crude Oil
1987-09-28 Well Mode changed to Suspended
2006-03-22 Well Fluid changed to Crude Oil
2006-03-22 Well Mode changed to Flowing
2006-04-01 Well Fluid changed to Crude Oil
2006-04-01 Well Mode changed to Suspended
2007-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-28 Plug Back Performed
2007-10-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-07-13 Open Hole/Barefoot Completion 2599.30 2630.40 0
1985-04-17 Acid Treatment 2586.70 2590.20 0
2007-10-28 Packing Device Capped w/Cement 2567.00 2575.00 0
1961-07-15 Acid Treatment 2599.30 2630.40 0
1961-07-22 Perforation 2599.30 2600.20 10
1961-07-22 Perforation 2600.20 2605.10 7
1961-07-26 Acid Treatment 2599.30 2630.40 0
1961-08-02 Perforation 2592.60 2594.50 7
1961-08-04 Acid Treatment 2592.60 2594.50 0
1985-04-15 Cement Squeeze 2592.60 2630.40 0
1985-04-16 Perforation 2586.70 2590.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1969 145 0.0 0.0 0.0
1974 529 0.0 0.0 0.0
1975 233 0.0 0.0 0.0
1980 4427 0.0 0.0 0.0
1981 1422 0.0 0.0 0.0
1982 720 0.0 0.0 0.0
1983 530 0.0 0.0 0.0
1985 3961 0.0 0.0 0.0
1987 3181 0.0 0.0 0.0
2006 48 0.0 0.0 0.0

For data sources see[5]

References