X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325042309000

Well Details

Well ID: 0325042309000
Loading map...
Location: 00/09-23-032-04W5/0
Location Alias: 00/09-23-32-04 W5M
Location Alias 2: 00/09-23-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 23
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 9-23-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0015710
License Date: 1958-05-07
License Status: Abandoned
Spud Date: 1958-08-13
Final Drill Date: 1958-09-13
Well Total Depth: 2653.90 m
Surface Hole Latitude: 51.760386
Surface Hole Longitude: -114.453539

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-05-07 Obtained License
1958-09-13 Finished Drilling
1958-09-13 Well Mode changed to Drilled and Cased
1958-09-15 Production Casing Operation Performed
1958-09-20 Perforation Treatment Performed - Jet Perforation
1958-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-24 Well Began Production
1958-09-24 Well Fluid changed to Crude Oil
1958-09-24 Well Mode changed to Flowing
1958-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-11 Well Fluid changed to Crude Oil
1980-02-11 Well Mode changed to Pumping
1988-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-09 Well Fluid changed to Crude Oil
1998-04-09 Well Mode changed to Suspended
2003-05-14 Well Fluid changed to Crude Oil
2003-05-14 Well Mode changed to Pumping
2003-05-16 Well Fluid changed to Crude Oil
2003-05-16 Well Mode changed to Suspended
2004-09-26 Well Log Performed
2004-09-27 Well Log Performed
2005-06-19 Well Log Performed
2005-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-20 Perforation Treatment Performed - Jet Perforation
2005-06-20 Plug Back Performed
2005-06-20 Well Fluid changed to Crude Oil
2005-06-20 Well Log Performed
2005-06-20 Well Mode changed to Abandoned Zone
2005-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-22 Perforation Treatment Performed - Remedial Casing
2005-06-22 Plug Back Performed
2005-06-23 Well Log Performed
2005-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-24 Perforation Treatment Performed - Jet Perforation
2005-06-24 Perforation Treatment Performed - Remedial Casing
2005-06-24 Plug Back Performed
2005-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-25 Plug Back Performed
2005-06-25 Well Log Performed
2005-06-26 Perforation Treatment Performed - Jet Perforation
2005-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-27 Perforation Treatment Performed - Jet Perforation
2005-06-27 Perforation Treatment Performed - Remedial Casing
2005-06-27 Plug Back Performed
2005-06-27 Well Log Performed
2005-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-28 Perforation Treatment Performed - Remedial Casing
2005-06-28 Plug Back Performed
2005-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-29 Perforation Treatment Performed - Jet Perforation
2005-06-29 Perforation Treatment Performed - Remedial Casing
2005-06-29 Plug Back Performed
2005-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-30 Perforation Treatment Performed - Remedial Casing
2005-06-30 Plug Back Performed
2005-07-05 Perforation Treatment Performed - Jet Perforation
2005-07-05 Well Log Performed
2005-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-06 Perforation Treatment Performed - Remedial Casing
2005-07-06 Plug Back Performed
2005-10-03 Well Abandoned
2005-10-03 Well Fluid changed to Crude Oil
2005-10-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-09-20 Perforation 2640.20 2643.20 13
2005-06-20 Packing Device Capped w/Cement 2610.00 2618.00 0
2005-06-20 Perforation 1406.70 1407.70 17
2005-06-22 Remedial Casing Cementing 1406.70 1407.70 0
2005-06-22 Packing Device Capped w/Cement 1397.20 1412.20 0
2005-06-22 Packing Device Capped w/Cement 1382.70 1396.70 0
2005-06-24 Perforation 898.50 899.50 17
2005-06-24 Remedial Casing Cementing 898.50 899.50 0
2005-06-24 Packing Device Capped w/Cement 889.00 904.50 0
2005-06-24 Packing Device Capped w/Cement 874.50 888.50 0
2005-06-25 Packing Device Capped w/Cement 668.00 708.00 0
1958-09-20 Perforation 2635.90 2638.30 13
2005-06-26 Perforation 604.00 605.00 17
2005-06-27 Remedial Casing Cementing 604.00 605.00 0
2005-06-27 Packing Device Capped w/Cement 595.50 620.00 0
2005-06-27 Packing Device Capped w/Cement 577.00 595.00 0
2005-06-27 Perforation 465.00 466.00 17
2005-06-28 Remedial Casing Cementing 465.00 466.00 0
2005-06-28 Packing Device Capped w/Cement 436.00 457.00 0
2005-06-29 Perforation 411.00 412.00 17
2005-06-29 Remedial Casing Cementing 411.00 412.00 0
2005-06-29 Packing Device Capped w/Cement 385.00 400.00 0
1958-09-20 Perforation 2619.50 2628.60 13
2005-06-29 Perforation 325.00 326.00 17
2005-06-30 Remedial Casing Cementing 325.00 326.00 0
2005-06-30 Packing Device Capped w/Cement 292.00 311.00 0
2005-07-05 Perforation 207.00 208.00 17
2005-07-06 Remedial Casing Cementing 207.00 208.00 0
2005-07-06 Packing Device Capped w/Cement 185.00 197.00 0
1958-09-24 Acid Treatment 2635.90 2638.30 0
1958-09-24 Acid Treatment 2640.20 2643.20 0
1958-09-26 Acid Treatment 2619.50 2628.60 0
1958-09-26 Acid Treatment 2635.90 2638.30 0
1958-09-26 Acid Treatment 2640.20 2643.20 0
1988-06-07 Acid Treatment 2619.50 2643.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1973 693 0.0 0.0 0.0
1974 8202 0.0 0.0 0.0
1975 8447 0.0 0.0 0.0
1976 3802 0.0 0.0 0.0
1977 7648 0.0 0.0 0.0
1978 4188 0.0 0.0 0.0
1979 8196 0.0 0.0 0.0
1980 7380 0.0 0.0 0.0
1981 7057 0.0 0.0 0.0
1982 8012 0.0 0.0 0.0
1983 8161 0.0 0.0 0.0
1984 8315 0.0 0.0 0.0
1985 7756 0.0 0.0 0.0
1986 8211 0.0 0.0 0.0
1987 7415 0.0 0.0 0.0
1988 3404 0.0 0.0 0.0
1989 4316 0.0 0.0 0.0
1990 7126 0.0 0.0 0.0
1991 8315 0.0 0.0 0.0
1992 7891 0.0 0.0 0.0
1993 7087 0.0 0.0 0.0
1994 8084 0.0 0.0 0.0
1995 3052 0.0 0.0 0.0

For data sources see[5]

References