X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325041801000

Well Details

Well ID: 0325041801000
Loading map...
Location: 00/01-18-032-04W5/0
Location Alias: 00/01-18-32-04 W5M
Location Alias 2: 00/01-18-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 18
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 1-18-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0012070
License Date: 1956-08-10
License Status: Abandoned
Spud Date: 1956-09-04
Final Drill Date: 1956-10-05
Well Total Depth: 2804.20 m
Surface Hole Latitude: 51.738982
Surface Hole Longitude: -114.547988

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-08-10 Obtained License
1956-10-05 Finished Drilling
1956-10-05 Well Mode changed to Drilled and Cased
1956-10-06 Production Casing Operation Performed
1956-10-08 Well Log Performed
1956-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-09 Perforation Treatment Performed - Bullet Perforation
1956-10-09 Perforation Treatment Performed - Jet Perforation
1956-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-15 Perforation Treatment Performed - Bullet Perforation
1956-10-18 Drill Stem Test Performed
1956-10-27 Well Began Production
1956-10-27 Well Fluid changed to Crude Oil
1956-10-27 Well Mode changed to Flowing
1957-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-10-15 Perforation Treatment Performed - Jet Perforation
1972-02-23 Well Began Injection
1972-02-23 Well Fluid changed to Water
1972-02-23 Well Type changed to Injection
1973-08-13 Perforation Treatment Performed - Open-Hole Completion
1973-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-01 Well Fluid changed to Water
1984-04-01 Well Mode changed to Suspended
1984-04-01 Well Type changed to Injection
1989-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-23 Plug Back Performed
1989-04-23 Well Fluid changed to Water
1989-04-23 Well Mode changed to Abandoned Zone
1989-04-23 Well Type changed to Injection
1999-08-26 Perforation Treatment Performed - Jet Perforation
1999-08-26 Perforation Treatment Performed - Remedial Casing
1999-11-01 Well Abandoned
1999-11-01 Well Fluid changed to Water
1999-11-01 Well Mode changed to Abandoned
1999-11-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-10-09 Perforation 2791.70 2794.70 13
1973-08-17 Acid Treatment 2784.70 2804.20 0
1989-04-23 Packing Device Capped w/Cement 2762.00 2770.00 0
1999-08-26 Perforation 558.00 559.00 13
1999-08-26 Remedial Casing Cementing 558.00 559.00 0
1956-10-09 Acid Treatment 2791.70 2794.70 0
1956-10-09 Bullet Perforation 2791.70 2794.70 13
1956-10-09 Acid Treatment 2791.70 2794.70 0
1956-10-15 Bullet Perforation 2794.10 2795.90 13
1956-10-15 Acid Treatment 2794.10 2795.90 0
1957-02-05 Acid Treatment 2791.70 2795.90 0
1971-10-15 Perforation 2784.70 2790.70 7
1973-08-13 Open Hole/Barefoot Completion 2796.50 2804.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1969 619 0.0 0.0 0.0
1970 880 0.0 0.0 0.0
1971 5969 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References