X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325041414000

Well Details

Well ID: 0325041414000
Loading map...
Location: 00/14-14-032-04W5/0
Location Alias: 00/14-14-32-04 W5M
Location Alias 2: 00/14-14-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 14
County/Municipality: Mountain View County
Well Name: EMC HZ HARME 14-14-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0435923
License Date: 2011-08-11
License Status: Amended
Spud Date: 2011-11-10
Final Drill Date: 2011-11-23
Well Total Depth: 3383.00 m
Surface Hole Latitude: 51.744998
Surface Hole Longitude: -114.449447

For data sources see[1][2]

Well History

Date Event
2011-08-11 Obtained License
2011-11-13 Surface Casing Operation Performed
2011-11-15 Direction Drilling Operation Performed - Deviate
2011-11-15 Well Log Performed
2011-11-19 Direction Drilling Operation Performed - Horizontal
2011-11-23 Finished Drilling
2011-11-23 Well Mode changed to Drilled and Cased
2011-11-24 Well Log Performed
2011-11-25 Perforation Treatment Performed - Open-Hole Completion
2011-11-25 Production Casing Operation Performed
2011-11-26 Rig Released
2011-12-09 Well Log Performed
2011-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-16 Well Began Production
2011-12-16 Well Fluid changed to Crude Oil
2011-12-16 Well Mode changed to Flowing
2012-10-01 Well Fluid changed to Crude Oil
2012-10-01 Well Mode changed to Pumping
2016-11-01 Well Fluid changed to Crude Oil
2016-11-01 Well Mode changed to Suspended
2017-02-01 Well Fluid changed to Crude Oil
2017-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-15 896.00 Deviate (5 - 79 degrees)
2011-11-19 2355.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-25 Open Hole/Barefoot Completion 3378.00 3383.00 0
2011-12-13 Multi-Stage Fracture 2910.00 3356.70 0
2011-12-14 Multi-Stage Fracture 2457.50 2841.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 72 0.0 0.0 0.0
2012 6614 0.0 0.0 0.0
2013 7112 0.0 0.0 0.0
2014 5460 0.0 0.0 0.0
2015 6035 0.0 0.0 0.0
2017 7386 0.0 0.0 0.0
2018 5779 0.0 0.0 0.0
2019 8612 0.0 0.0 0.0
2020 1861 0.0 0.0 0.0

For data sources see[6]

References