X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325041209000

Well Details

Well ID: 0325041209000
Loading map...
Location: 00/09-12-032-04W5/0
Location Alias: 00/09-12-32-04 W5M
Location Alias 2: 00/09-12-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 12
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 9-12-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0016275
License Date: 1958-11-21
License Status: Suspension
Spud Date: 1959-08-24
Final Drill Date: 1959-09-22
Well Total Depth: 2613.70 m
Surface Hole Latitude: 51.731261
Surface Hole Longitude: -114.429958

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-21 Obtained License
1959-09-22 Finished Drilling
1959-09-22 Well Mode changed to Drilled and Cased
1959-09-23 Production Casing Operation Performed
1959-09-28 Perforation Treatment Performed - Open-Hole Completion
1959-09-29 Well Began Production
1959-09-29 Well Fluid changed to Crude Oil
1959-09-29 Well Mode changed to Flowing
1966-06-02 Perforation Treatment Performed - Bullet Perforation
1977-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-15 Perforation Treatment Performed - Cement Squeeze
1977-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-28 Perforation Treatment Performed - Cement Squeeze
1977-11-29 Perforation Treatment Performed - Cement Squeeze
1977-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-05 Well Fluid changed to Crude Oil
1977-12-05 Well Mode changed to Gas Lift
1984-03-05 Well Log Performed
2013-01-01 Well Fluid changed to Crude Oil
2013-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-28 Open Hole/Barefoot Completion 2593.80 2613.70 0
1966-06-02 Bullet Perforation 2571.00 2591.40 0
1977-11-15 Acid Treatment 2571.00 2591.40 0
1977-11-15 Cement Squeeze 2571.00 2591.40 0
1977-11-23 Acid Treatment 2593.80 2613.70 0
1977-11-28 Cement Squeeze 2571.00 2591.40 0
1977-11-29 Cement Squeeze 2571.00 2591.40 0
1977-12-02 Acid Treatment 2593.80 2613.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 24 0.0 0.0 0.0
1977 389 0.0 0.0 0.0
1978 7776 0.0 0.0 0.0
1979 8187 0.0 0.0 0.0
1980 6257 0.0 0.0 0.0
1981 7933 0.0 0.0 0.0
1982 6985 0.0 0.0 0.0
1983 8315 0.0 0.0 0.0
1984 8285 0.0 0.0 0.0
1985 8187 0.0 0.0 0.0
1986 7935 0.0 0.0 0.0
1987 7977 0.0 0.0 0.0
1988 7984 0.0 0.0 0.0
1989 7369 0.0 0.0 0.0
1990 8056 0.0 0.0 0.0
1991 8450 0.0 0.0 0.0
1992 8042 0.0 0.0 0.0
1993 7464 0.0 0.0 0.0
1994 7400 0.0 0.0 0.0
1995 8524 0.0 0.0 0.0
1996 8151 0.0 0.0 0.0
1997 8683 0.0 0.0 0.0
1998 8080 0.0 0.0 0.0
1999 8156 0.0 0.0 0.0
2000 8626 0.0 0.0 0.0
2001 8736 0.0 0.0 0.0
2002 8556 0.0 0.0 0.0
2003 8584 0.0 0.0 0.0
2004 8379 0.0 0.0 0.0
2005 8289 0.0 0.0 0.0
2006 7853 0.0 0.0 0.0
2007 8604 0.0 0.0 0.0
2008 7159 0.0 0.0 0.0
2009 5720 0.0 0.0 0.0
2010 8002 0.0 0.0 0.0
2011 5025 0.0 0.0 0.0

For data sources see[5]

References