X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325040410002

Well Details

Well ID: 0325040410002
Loading map...
Location: 00/10-04-032-04W5/2
Location Alias: 00/10-04-32-04 W5M
Location Alias 2: 00/10-04-032-04 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 04
County/Municipality: Mountain View County
Well Name: CDN-SUP UNIT HARM 10-4MU-32-4
Operator Name: ExxonMobil Canada Resources Company
License Number: 0026085
License Date: 1964-05-11
License Status: Abandoned
Spud Date: 1964-05-21
Final Drill Date: 1964-06-15
Well Total Depth: 2741.70 m
Surface Hole Latitude: 51.717345
Surface Hole Longitude: -114.507113

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-11 Obtained License
1964-06-15 Finished Drilling
1964-06-15 Well Mode changed to Drilled and Cased
1964-06-16 Drill Stem Test Performed
1964-06-18 Drill Stem Test Performed
1964-06-20 Production Casing Operation Performed
1964-08-24 Perforation Treatment Performed - Bullet Perforation
1964-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-28 Well Began Production
1964-10-28 Well Fluid changed to Gas
1964-10-28 Well Mode changed to Flowing
1971-12-31 Well Fluid changed to Gas
1971-12-31 Well Mode changed to Suspended
1972-02-09 Perforation Treatment Performed - Cement Squeeze
1972-02-23 Well Began Injection
1972-02-23 Well Fluid changed to Solvent
1972-02-23 Well Type changed to Injection
1994-04-15 Well Fluid changed to Solvent
1994-04-15 Well Mode changed to Suspended
1994-04-15 Well Type changed to Injection
1996-07-05 Well Fluid changed to Gas
1996-07-05 Well Mode changed to Flowing
1996-07-07 Well Fluid changed to Gas
1996-07-07 Well Mode changed to Suspended
1996-07-17 Well Fluid changed to Gas
1996-07-17 Well Mode changed to Flowing
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2016-11-01 Well Fluid changed to Gas
2016-11-01 Well Mode changed to Flowing
2016-11-17 Perforation Treatment Performed - Cement Plug
2016-11-17 Perforation Treatment Performed - Remedial Casing
2016-11-17 Plug Back Performed
2016-11-17 Well Fluid changed to Gas
2016-11-17 Well Mode changed to Abandoned
2016-11-23 Perforation Treatment Performed - Jet Perforation
2016-11-23 Well Log Performed
2016-11-24 Perforation Treatment Performed - Cement Plug
2016-11-24 Perforation Treatment Performed - Remedial Casing
2016-11-25 Perforation Treatment Performed - Jet Perforation
2016-11-25 Perforation Treatment Performed - Remedial Casing
2016-11-25 Well Log Performed
2016-11-26 Perforation Treatment Performed - Cement Plug
2016-11-27 Perforation Treatment Performed - Cement Plug
2016-11-28 Perforation Treatment Performed - Jet Perforation
2016-11-28 Well Log Performed
2016-11-29 Perforation Treatment Performed - Cement Plug
2016-11-29 Perforation Treatment Performed - Remedial Casing
2017-11-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-08-24 Bullet Perforation 2715.80 2717.00 7
2016-11-23 Perforation 2096.70 2097.60 17
2016-11-24 Remedial Casing Cementing 2096.70 2097.60 0
2016-11-24 Cement Plug 1994.00 2658.00 0
2016-11-25 Perforation 1431.30 1432.30 17
2016-11-25 Perforation 990.00 991.00 17
2016-11-25 Perforation 786.40 787.40 17
2016-11-25 Perforation 600.00 601.00 17
2016-11-25 Remedial Casing Cementing 600.00 1432.30 0
2016-11-26 Cement Plug 1449.00 2034.00 0
2016-11-27 Cement Plug 1028.00 1455.00 0
1964-08-24 Bullet Perforation 2685.90 2705.10 3
2016-11-27 Cement Plug 593.00 1028.00 0
2016-11-28 Perforation 569.00 570.00 17
2016-11-28 Perforation 500.00 501.00 17
2016-11-28 Perforation 460.00 461.00 17
2016-11-28 Perforation 407.00 408.00 17
2016-11-28 Perforation 366.00 367.00 17
2016-11-28 Perforation 308.00 309.00 17
2016-11-28 Perforation 266.00 267.00 17
2016-11-28 Perforation 198.00 199.00 17
2016-11-29 Remedial Casing Cementing 198.00 570.00 0
1964-08-24 Bullet Perforation 2672.50 2678.00 3
2016-11-29 Cement Plug 188.40 593.00 0
2016-11-29 Cement Plug 166.00 188.00 0
1964-08-25 Acid Treatment 2715.80 2717.00 0
1964-08-27 Acid Treatment 2678.00 2685.90 0
1972-02-09 Cement Squeeze 2715.80 2717.00 0
2016-11-17 Remedial Casing Cementing 2672.90 2705.10 0
2016-11-17 Cement Plug 2659.80 2705.10 0
2016-11-17 Cement Plug 2658.00 2659.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 5527 0.0 0.0 0.0
1970 6709 0.0 0.0 0.0
1971 6394 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1996 3901 0.0 0.0 0.0
1997 8724 0.0 0.0 0.0
1998 8563 0.0 0.0 0.0
1999 8137 0.0 0.0 0.0
2000 8588 0.0 0.0 0.0
2001 8731 0.0 0.0 0.0
2002 4506 0.0 0.0 0.0
2003 7187 0.0 0.0 0.0
2004 7381 0.0 0.0 0.0
2005 3506 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References