X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325033314000

Well Details

Well ID: 0325033314000
Loading map...
Location: 00/14-33-032-03W5/0
Location Alias: 00/14-33-32-03 W5M
Location Alias 2: 00/14-33-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 33
County/Municipality: Mountain View County
Well Name: RIDGEBACK HARME 14-33-32-3
Operator Name: Ridgeback Resources Inc.
License Number: 0416930
License Date: 2010-01-08
License Status: Amended
Spud Date: 2010-03-02
Final Drill Date: 2010-03-10
Well Total Depth: 3134.00 m
Surface Hole Latitude: 51.794280
Surface Hole Longitude: -114.354567

For data sources see[1][2]

Well History

Date Event
2010-01-08 Obtained License
2010-03-03 Surface Casing Operation Performed
2010-03-05 Direction Drilling Operation Performed - Horizontal
2010-03-07 Intermediate Casing Operation Performed
2010-03-10 Finished Drilling
2010-03-10 Well Mode changed to Drilled and Cased
2010-03-12 Liner Casing Operation Performed
2010-03-13 Rig Released
2010-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-12 Well Began Production
2010-07-12 Well Fluid changed to Crude Oil
2010-07-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-05 1683.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-09 Multi-Stage Fracture 3130.00 3130.10 0
2010-07-10 Multi-Stage Fracture 2458.10 2458.20 0
2010-07-10 Multi-Stage Fracture 2388.00 2388.10 0
2010-07-10 Multi-Stage Fracture 2317.70 2317.80 0
2010-07-10 Multi-Stage Fracture 2234.70 2234.80 0
2010-07-10 Multi-Stage Fracture 2164.00 2164.10 0
2010-07-10 Multi-Stage Fracture 2093.50 2093.60 0
2010-07-09 Multi-Stage Fracture 3059.40 3059.50 0
2010-07-09 Multi-Stage Fracture 2989.20 2989.30 0
2010-07-09 Multi-Stage Fracture 2918.50 2918.60 0
2010-07-09 Multi-Stage Fracture 2835.70 2835.80 0
2010-07-09 Multi-Stage Fracture 2765.40 2765.50 0
2010-07-09 Multi-Stage Fracture 2612.20 2612.30 0
2010-07-09 Multi-Stage Fracture 2682.80 2682.90 0
2010-07-10 Multi-Stage Fracture 2541.50 2541.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2846 0.0 0.0 0.0
2011 8078 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8462 0.0 0.0 0.0
2015 8143 0.0 0.0 0.0
2016 8495 0.0 0.0 0.0
2017 8577 0.0 0.0 0.0
2018 7947 0.0 0.0 0.0
2019 8375 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References