If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325033304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.778734,"lon":-114.35706,"icon":""}]} |
Location: 00/04-33-032-03W5/0 | |
Location Alias: 00/04-33-32-03 W5M | |
Location Alias 2: 00/04-33-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 33 | |
County/Municipality: Mountain View County | |
Well Name: RIDGEBACK HARME 4-33-32-3 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0455474 | |
License Date: 2013-02-26 | |
License Status: Amended | |
Spud Date: 2013-03-21 | |
Final Drill Date: 2013-03-31 | |
Well Total Depth: 3525.00 m | |
Surface Hole Latitude: 51.778734 | |
Surface Hole Longitude: -114.357060 |
Date | Event |
---|---|
2013-02-26 | Obtained License |
2013-03-23 | Surface Casing Operation Performed |
2013-03-25 | Direction Drilling Operation Performed - Deviate |
2013-03-26 | Direction Drilling Operation Performed - Horizontal |
2013-03-31 | Finished Drilling |
2013-03-31 | Well Log Performed |
2013-03-31 | Well Mode changed to Drilled and Cased |
2013-04-01 | Perforation Treatment Performed - Open-Hole Completion |
2013-04-01 | Production Casing Operation Performed |
2013-04-02 | Rig Released |
2013-04-08 | Well Log Performed |
2013-04-18 | Well Log Performed |
2013-04-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-04-22 | Well Began Production |
2013-04-22 | Well Fluid changed to Crude Oil |
2013-04-22 | Well Mode changed to Flowing |
2013-04-26 | Well Log Performed |
2013-06-12 | Well Fluid changed to Crude Oil |
2013-06-12 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-03-21 | Savanna Drilling Corp. | 652 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-03-25 | 1632.50 | Deviate (5 - 79 degrees) |
2013-03-26 | 2156.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-04-01 | Open Hole/Barefoot Completion | 3523.00 | 3525.00 | 0 |
2013-04-21 | Multi-Stage Fracture | 2965.70 | 2965.80 | 0 |
2013-04-21 | Multi-Stage Fracture | 2893.30 | 2893.40 | 0 |
2013-04-21 | Multi-Stage Fracture | 2834.30 | 2834.40 | 0 |
2013-04-21 | Multi-Stage Fracture | 2762.50 | 2762.60 | 0 |
2013-04-21 | Multi-Stage Fracture | 2703.40 | 2703.50 | 0 |
2013-04-21 | Multi-Stage Fracture | 2631.40 | 2631.50 | 0 |
2013-04-21 | Multi-Stage Fracture | 2572.60 | 2572.70 | 0 |
2013-04-21 | Multi-Stage Fracture | 2500.20 | 2500.30 | 0 |
2013-04-21 | Multi-Stage Fracture | 2441.10 | 2441.20 | 0 |
2013-04-21 | Multi-Stage Fracture | 2368.60 | 2368.70 | 0 |
2013-04-21 | Multi-Stage Fracture | 3498.20 | 3498.30 | 0 |
2013-04-21 | Multi-Stage Fracture | 2296.30 | 2296.40 | 0 |
2013-04-21 | Multi-Stage Fracture | 2238.10 | 2238.20 | 0 |
2013-04-21 | Multi-Stage Fracture | 3432.40 | 3432.50 | 0 |
2013-04-21 | Multi-Stage Fracture | 3359.90 | 3360.00 | 0 |
2013-04-21 | Multi-Stage Fracture | 3300.90 | 3301.00 | 0 |
2013-04-21 | Multi-Stage Fracture | 3228.50 | 3228.60 | 0 |
2013-04-21 | Multi-Stage Fracture | 3169.50 | 3169.60 | 0 |
2013-04-21 | Multi-Stage Fracture | 3097.40 | 3097.50 | 0 |
2013-04-21 | Multi-Stage Fracture | 3024.80 | 3024.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-21 | 2013-04-21 | 1,943 | 2,095 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 79.3535 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.9885 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.0113 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.3515 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0105 | N/A | |
Water | 7732-18-5 | 100 | 0.0112 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1852 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0858 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0882 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0862 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1038 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0858 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0879 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0882 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.0331 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.063 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-04-21 | 2013-04-21 | Surface Water - Runoff | 2400 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5395 | 0.0 | 0.0 | 0.0 |
2014 | 8579 | 0.0 | 0.0 | 0.0 |
2015 | 8137 | 0.0 | 0.0 | 0.0 |
2016 | 8495 | 0.0 | 0.0 | 0.0 |
2017 | 8584 | 0.0 | 0.0 | 0.0 |
2018 | 7971 | 0.0 | 0.0 | 0.0 |
2019 | 8615 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-04-02 | No Incident Encountered | 0.00 | 0.00 |
2013-04-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]