X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325032804000

Well Details

Well ID: 0325032804000
Loading map...
Location: 00/04-28-032-03W5/0
Location Alias: 00/04-28-32-03 W5M
Location Alias 2: 00/04-28-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 28
County/Municipality: Mountain View County
Well Name: RIDGEBACK HARME 4-28-32-3
Operator Name: Ridgeback Resources Inc.
License Number: 0432513
License Date: 2011-03-22
License Status: Issued
Spud Date: 2011-09-30
Final Drill Date: 2011-10-09
Well Total Depth: 3524.00 m
Surface Hole Latitude: 51.783686
Surface Hole Longitude: -114.374646

For data sources see[1][2]

Well History

Date Event
2011-03-22 Obtained License
2011-10-01 Surface Casing Operation Performed
2011-10-03 Direction Drilling Operation Performed - Horizontal
2011-10-09 Finished Drilling
2011-10-09 Well Log Performed
2011-10-09 Well Mode changed to Drilled and Cased
2011-10-11 Production Casing Operation Performed
2011-10-12 Perforation Treatment Performed - Open-Hole Completion
2011-10-12 Rig Released
2011-10-22 Well Log Performed
2011-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-05 Well Began Production
2011-11-05 Well Fluid changed to Crude Oil
2011-11-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-03 1533.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-12 Open Hole/Barefoot Completion 3523.00 3524.00 0
2011-11-04 Multi-Stage Fracture 2964.50 2964.60 0
2011-11-04 Multi-Stage Fracture 2890.10 2890.20 0
2011-11-04 Multi-Stage Fracture 2829.30 2829.40 0
2011-11-04 Multi-Stage Fracture 2754.80 2754.90 0
2011-11-04 Multi-Stage Fracture 2694.20 2694.30 0
2011-11-04 Multi-Stage Fracture 2619.60 2619.70 0
2011-11-04 Multi-Stage Fracture 2558.80 2558.90 0
2011-11-04 Multi-Stage Fracture 2484.40 2484.50 0
2011-11-04 Multi-Stage Fracture 2424.00 2424.10 0
2011-11-04 Multi-Stage Fracture 2363.40 2363.50 0
2011-11-03 Multi-Stage Fracture 3497.60 3497.70 0
2011-11-04 Multi-Stage Fracture 2288.60 2288.70 0
2011-11-04 Multi-Stage Fracture 2227.80 2227.90 0
2011-11-03 Multi-Stage Fracture 3430.90 3431.00 0
2011-11-03 Multi-Stage Fracture 3356.20 3356.30 0
2011-11-03 Multi-Stage Fracture 3295.30 3295.40 0
2011-11-03 Multi-Stage Fracture 3234.60 3234.70 0
2011-11-04 Multi-Stage Fracture 3160.00 3160.10 0
2011-11-04 Multi-Stage Fracture 3099.50 3099.60 0
2011-11-04 Multi-Stage Fracture 3025.10 3025.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 956 0.0 0.0 0.0
2012 8559 0.0 0.0 0.0
2013 8613 0.0 0.0 0.0
2014 8643 0.0 0.0 0.0
2015 8147 0.0 0.0 0.0
2016 8448 0.0 0.0 0.0
2017 8559 0.0 0.0 0.0
2018 8006 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References