X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325032101000

Well Details

Well ID: 0325032101000
Loading map...
Location: 00/01-21-032-03W5/0
Location Alias: 00/01-21-32-03 W5M
Location Alias 2: 00/01-21-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 21
County/Municipality: Mountain View County
Well Name: RIDGEBACK HARME 1-21-32-3
Operator Name: Ridgeback Resources Inc.
License Number: 0436875
License Date: 2011-09-16
License Status: Issued
Spud Date: 2011-10-15
Final Drill Date: 2011-10-25
Well Total Depth: 3580.00 m
Surface Hole Latitude: 51.768472
Surface Hole Longitude: -114.357304

For data sources see[1][2]

Well History

Date Event
2011-09-16 Obtained License
2011-10-17 Surface Casing Operation Performed
2011-10-19 Direction Drilling Operation Performed - Horizontal
2011-10-25 Finished Drilling
2011-10-25 Well Log Performed
2011-10-25 Well Mode changed to Drilled and Cased
2011-10-27 Perforation Treatment Performed - Open-Hole Completion
2011-10-27 Production Casing Operation Performed
2011-10-29 Rig Released
2011-11-04 Well Log Performed
2011-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-12 Well Began Production
2011-11-12 Well Fluid changed to Crude Oil
2011-11-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-19 1959.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-27 Open Hole/Barefoot Completion 3577.00 3580.00 0
2011-11-10 Multi-Stage Fracture 3005.50 3005.60 0
2011-11-10 Multi-Stage Fracture 2945.70 2945.80 0
2011-11-10 Multi-Stage Fracture 2871.60 2871.70 0
2011-11-10 Multi-Stage Fracture 2810.50 2810.60 0
2011-11-11 Multi-Stage Fracture 2738.20 2738.30 0
2011-11-11 Multi-Stage Fracture 2663.50 2663.60 0
2011-11-11 Multi-Stage Fracture 2602.50 2602.60 0
2011-11-11 Multi-Stage Fracture 2527.70 2527.80 0
2011-11-11 Multi-Stage Fracture 2467.80 2467.90 0
2011-11-11 Multi-Stage Fracture 2393.90 2394.00 0
2011-11-09 Multi-Stage Fracture 3551.40 3551.50 0
2011-11-11 Multi-Stage Fracture 2333.60 2333.70 0
2011-11-11 Multi-Stage Fracture 2258.30 2258.40 0
2011-11-09 Multi-Stage Fracture 3485.20 3485.30 0
2011-11-09 Multi-Stage Fracture 3423.80 3423.90 0
2011-11-09 Multi-Stage Fracture 3348.40 3348.50 0
2011-11-09 Multi-Stage Fracture 3287.20 3287.30 0
2011-11-09 Multi-Stage Fracture 3213.40 3213.50 0
2011-11-09 Multi-Stage Fracture 3139.30 3139.40 0
2011-11-09 Multi-Stage Fracture 3079.80 3079.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 588 0.0 0.0 0.0
2012 8664 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 7319 0.0 0.0 0.0
2015 8105 0.0 0.0 0.0
2016 8441 0.0 0.0 0.0
2017 8584 0.0 0.0 0.0
2018 8024 0.0 0.0 0.0
2019 8615 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References