X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325032002000

Well Details

Well ID: 0325032002000
Loading map...
Location: 00/02-20-032-03W5/0
Location Alias: 00/02-20-32-03 W5M
Location Alias 2: 00/02-20-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 20
County/Municipality: Mountain View County
Well Name: TAC ET AL HZ HARME 2-20-32-3
Operator Name: Tamarack Acquisition Corp.
License Number: 0446041
License Date: 2012-05-24
License Status: Issued
Spud Date: 2012-06-01
Final Drill Date: 2012-06-10
Well Total Depth: 3393.00 m
Surface Hole Latitude: 51.765028
Surface Hole Longitude: -114.380761

For data sources see[1][2]

Well History

Date Event
2012-05-24 Obtained License
2012-06-03 Surface Casing Operation Performed
2012-06-05 Direction Drilling Operation Performed - Horizontal
2012-06-10 Finished Drilling
2012-06-10 Well Mode changed to Drilled and Cased
2012-06-11 Production Casing Operation Performed
2012-06-13 Rig Released
2012-07-04 Well Log Performed
2012-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-13 Well Began Production
2012-07-13 Well Fluid changed to Crude Oil
2012-07-13 Well Mode changed to Flowing
2012-10-21 Well Fluid changed to Crude Oil
2012-10-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-06-05 1523.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-12 Multi-Stage Fracture 3368.50 3369.00 0
2012-07-12 Multi-Stage Fracture 2717.50 2718.00 0
2012-07-12 Multi-Stage Fracture 2647.00 2647.50 0
2012-07-12 Multi-Stage Fracture 2575.50 2576.00 0
2012-07-12 Multi-Stage Fracture 2505.50 2506.00 0
2012-07-12 Multi-Stage Fracture 2414.50 2415.00 0
2012-07-12 Multi-Stage Fracture 2342.50 2343.00 0
2012-07-12 Multi-Stage Fracture 2270.00 2270.50 0
2012-07-12 Multi-Stage Fracture 2220.00 2220.50 0
2012-07-12 Multi-Stage Fracture 2170.50 2171.00 0
2012-07-12 Multi-Stage Fracture 3305.00 3305.50 0
2012-07-12 Multi-Stage Fracture 3233.50 3234.00 0
2012-07-12 Multi-Stage Fracture 3162.00 3162.50 0
2012-07-12 Multi-Stage Fracture 3091.50 3092.00 0
2012-07-12 Multi-Stage Fracture 3010.00 3010.50 0
2012-07-12 Multi-Stage Fracture 2939.00 2939.50 0
2012-07-12 Multi-Stage Fracture 2869.50 2870.00 0
2012-07-12 Multi-Stage Fracture 2799.00 2799.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3436 0.0 0.0 0.0
2013 8098 0.0 0.0 0.0
2014 8414 0.0 0.0 0.0
2015 7996 0.0 0.0 0.0
2016 8368 0.0 0.0 0.0
2017 8442 0.0 0.0 0.0
2018 7972 0.0 0.0 0.0
2019 7780 0.0 0.0 0.0
2020 1717 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-13 No Incident Encountered 0.00 0.00
2012-07-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References