X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325030603000

Well Details

Well ID: 0325030603000
Loading map...
Location: 00/03-06-032-03W5/0
Location Alias: 00/03-06-32-03 W5M
Location Alias 2: 00/03-06-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 06
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 3-6-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0019258
License Date: 1960-06-27
License Status: Suspension
Spud Date: 1960-07-04
Final Drill Date: 1960-08-03
Well Total Depth: 2651.80 m
Surface Hole Latitude: 51.709589
Surface Hole Longitude: -114.418013

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-27 Obtained License
1960-08-03 Finished Drilling
1960-08-03 Well Mode changed to Drilled and Cased
1960-08-05 Production Casing Operation Performed
1960-08-07 Perforation Treatment Performed - Open-Hole Completion
1960-08-12 Well Began Production
1960-08-12 Well Fluid changed to Crude Oil
1960-08-12 Well Mode changed to Flowing
1977-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-02 Perforation Treatment Performed - Jet Perforation
1977-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-07 Well Fluid changed to Crude Oil
1977-11-07 Well Mode changed to Gas Lift
1998-06-30 Well Fluid changed to Crude Oil
1998-06-30 Well Mode changed to Suspended
2002-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-26 Plug Back Performed
2002-03-26 Well Fluid changed to Crude Oil
2002-03-26 Well Log Performed
2002-03-26 Well Mode changed to Abandoned Zone
2002-03-28 Perforation Treatment Performed - Jet Perforation
2002-03-28 Well Log Performed
2002-04-02 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-07 Open Hole/Barefoot Completion 2634.40 2651.80 0
1977-09-28 Acid Treatment 2634.40 2651.80 0
1977-11-02 Perforation 2625.20 2632.90 7
1977-11-04 Acid Treatment 2625.20 2632.90 0
2002-03-26 Packing Device Capped w/Cement 2596.00 2606.00 0
2002-03-28 Perforation 2572.50 2575.00 20
2002-04-02 Fracture 2572.50 2575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 363 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1970 1087 0.0 0.0 0.0
1971 675 0.0 0.0 0.0
1972 7696 0.0 0.0 0.0
1973 7530 0.0 0.0 0.0
1974 7838 0.0 0.0 0.0
1975 7459 0.0 0.0 0.0
1976 5622 0.0 0.0 0.0
1977 7228 0.0 0.0 0.0
1978 5615 0.0 0.0 0.0
1979 8332 0.0 0.0 0.0
1980 8573 0.0 0.0 0.0
1981 7303 0.0 0.0 0.0
1982 877 0.0 0.0 0.0
1984 2751 0.0 0.0 0.0
1985 8041 0.0 0.0 0.0
1986 6523 0.0 0.0 0.0
1987 7096 0.0 0.0 0.0
1988 7744 0.0 0.0 0.0
1989 7118 0.0 0.0 0.0
1990 7844 0.0 0.0 0.0
1991 7852 0.0 0.0 0.0
1992 3752 0.0 0.0 0.0
1994 4661 0.0 0.0 0.0
1995 4738 0.0 0.0 0.0

For data sources see[5]

References