If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325030208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.709644,"lon":-114.336273,"icon":""}]} |
Location: 00/08-02-032-03W5/0 | |
Location Alias: 00/08-02-32-03 W5M | |
Location Alias 2: 00/08-02-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 02 | |
County/Municipality: Mountain View County | |
Well Name: BACCALIEU HZ HARME 8-2-32-3 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0446956 | |
License Date: 2012-06-29 | |
License Status: Issued | |
Spud Date: 2012-08-24 | |
Final Drill Date: 2012-09-05 | |
Well Total Depth: 3655.00 m | |
Surface Hole Latitude: 51.709644 | |
Surface Hole Longitude: -114.336273 |
Date | Event |
---|---|
2012-06-29 | Obtained License |
2012-08-25 | Surface Casing Operation Performed |
2012-08-27 | Direction Drilling Operation Performed - Deviate |
2012-08-29 | Direction Drilling Operation Performed - Horizontal |
2012-08-31 | Intermediate Casing Operation Performed |
2012-08-31 | Well Log Performed |
2012-09-05 | Finished Drilling |
2012-09-05 | Well Mode changed to Drilled and Cased |
2012-09-07 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-08 | Liner Casing Operation Performed |
2012-09-08 | Rig Released |
2012-10-01 | Well Began Production |
2012-10-01 | Well Fluid changed to Crude Oil |
2012-10-01 | Well Mode changed to Pumping |
2012-10-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-24 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-27 | 1617.00 | Deviate (5 - 79 degrees) |
2012-08-29 | 2160.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-07 | Open Hole/Barefoot Completion | 3650.00 | 3655.00 | 0 |
2012-10-04 | Multi-Stage Fracture | 3046.30 | 3046.40 | 0 |
2012-10-04 | Multi-Stage Fracture | 2985.20 | 2985.30 | 0 |
2012-10-04 | Multi-Stage Fracture | 2909.90 | 2910.00 | 0 |
2012-10-04 | Multi-Stage Fracture | 2834.70 | 2834.80 | 0 |
2012-10-04 | Multi-Stage Fracture | 2773.60 | 2773.70 | 0 |
2012-10-04 | Multi-Stage Fracture | 2698.20 | 2698.30 | 0 |
2012-10-04 | Multi-Stage Fracture | 2623.70 | 2623.80 | 0 |
2012-10-04 | Multi-Stage Fracture | 2562.30 | 2562.40 | 0 |
2012-10-04 | Multi-Stage Fracture | 2489.40 | 2489.50 | 0 |
2012-10-04 | Multi-Stage Fracture | 2413.90 | 2414.00 | 0 |
2012-10-03 | Multi-Stage Fracture | 3595.60 | 3595.70 | 0 |
2012-10-04 | Multi-Stage Fracture | 2341.20 | 2341.30 | 0 |
2012-10-04 | Multi-Stage Fracture | 2294.00 | 2294.10 | 0 |
2012-10-03 | Multi-Stage Fracture | 3534.00 | 3534.10 | 0 |
2012-10-03 | Multi-Stage Fracture | 3475.30 | 3475.40 | 0 |
2012-10-04 | Multi-Stage Fracture | 3401.50 | 3401.60 | 0 |
2012-10-04 | Multi-Stage Fracture | 3328.20 | 3328.30 | 0 |
2012-10-04 | Multi-Stage Fracture | 3255.30 | 3255.40 | 0 |
2012-10-04 | Multi-Stage Fracture | 3194.90 | 3195.00 | 0 |
2012-10-04 | Multi-Stage Fracture | 3121.60 | 3121.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1613 | 0.0 | 0.0 | 0.0 |
2013 | 8363 | 0.0 | 0.0 | 0.0 |
2014 | 8386 | 0.0 | 0.0 | 0.0 |
2015 | 8040 | 0.0 | 0.0 | 0.0 |
2016 | 7471 | 0.0 | 0.0 | 0.0 |
2017 | 8742 | 0.0 | 0.0 | 0.0 |
2018 | 7944 | 0.0 | 0.0 | 0.0 |
2019 | 8083 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-08 | No Incident Encountered | 0.00 | 0.00 |
2012-10-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]