If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325012716002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.768778,"lon":-114.056116,"icon":""}]} |
Location: 00/16-27-032-01W5/2 | |
Location Alias: 00/16-27-32-01 W5M | |
Location Alias 2: 00/16-27-032-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Mountain View County | |
Well Name: NAL GARR 16-27-32-1 | |
Operator Name: NAL Resources Limited | |
License Number: 0292020 | |
License Date: 2003-08-28 | |
License Status: Issued | |
Spud Date: 2003-09-04 | |
Final Drill Date: 2003-09-28 | |
Well Total Depth: 3600.00 m | |
Surface Hole Latitude: 51.768778 | |
Surface Hole Longitude: -114.056116 |
Date | Event |
---|---|
2003-08-28 | Obtained License |
2003-09-04 | Direction Drilling Operation Performed - Horizontal |
2003-09-06 | Surface Casing Operation Performed |
2003-09-17 | Well Log Performed |
2003-09-18 | Production Casing Operation Performed |
2003-09-28 | Finished Drilling |
2003-09-28 | Well Mode changed to Drilled and Cased |
2003-10-01 | Perforation Treatment Performed - Open-Hole Completion |
2003-10-02 | Rig Released |
2004-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-19 | Plug Back Performed |
2004-02-19 | Well Log Performed |
2004-02-21 | Perforation Treatment Performed - Jet Perforation |
2004-02-21 | Well Log Performed |
2004-02-29 | Perforation Treatment Performed - Fractured |
2004-04-22 | Well Began Production |
2004-04-22 | Well Fluid changed to Gas |
2004-04-22 | Well Mode changed to Flowing |
2009-04-01 | Well Fluid changed to Gas |
2009-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2003-09-04 | 2364.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-10-01 | Open Hole/Barefoot Completion | 2647.60 | 3600.00 | 0 |
2004-02-19 | Packing Device Capped w/Cement | 2587.00 | 2595.00 | 0 |
2004-02-21 | Perforation | 1948.00 | 1951.00 | 14 |
2004-02-29 | Fracture | 1948.00 | 1951.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 5708 | 0.0 | 0.0 | 0.0 |
2005 | 7553 | 0.0 | 0.0 | 0.0 |
2006 | 7323 | 0.0 | 0.0 | 0.0 |
2007 | 7942 | 0.0 | 0.0 | 0.0 |
2008 | 8519 | 0.0 | 0.0 | 0.0 |
2009 | 7821 | 0.0 | 0.0 | 0.0 |
2010 | 8279 | 0.0 | 0.0 | 0.0 |
2011 | 8735 | 0.0 | 0.0 | 0.0 |
2012 | 7991 | 0.0 | 0.0 | 0.0 |
2013 | 8672 | 0.0 | 0.0 | 0.0 |
2014 | 8472 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 7417 | 0.0 | 0.0 | 0.0 |
2017 | 8457 | 0.0 | 0.0 | 0.0 |
2018 | 7741 | 0.0 | 0.0 | 0.0 |
2019 | 6030 | 0.0 | 0.0 | 0.0 |
2020 | 1898 | 0.0 | 0.0 | 0.0 |
For data sources see[6]